Daily work force report, World Trade Center, Feb 1, 2002

Machine-extracted title · confidence 95%

Night shift daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.

NYC-WTC_000237688
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-15 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: 2/1/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions; Cold and Blustery

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 FIELD ENGINEER 1 CAT 365 GRAPPLER 1 FOREMEN 3 CAT 375 GRAPPLER 2 SAFETY OFFICER HITACHI 750 GRAPPLER 1 LABORERS 12 HITACHI 1200 GRAPPLER 1 IRON WORKERS 185 CFM COMPRESSOR 1 LOCAL 14 5 235 HAMMER HOE RAM LOCAL 15 6 MECHANICS TRUCK 1 1 CARPENTER TOOL TRUCK CARPENTER FOREMAN TOOL VAN TEAMSTERS (FUEL) 1 ROLL OFF TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 DUMP TRAILERS MECHANICS 1 LOW BED TRAILER HOUSE WRECKERS HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 DELIVERIES: N/A LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS DELAYS: SLOW MOVEMENT REGARDING 10 WHEEL DUMP TRUCK EUCLIDS DUE TO FDNY/NYPO/PAPD FLASHING ARROW BOARD REQUEST TO SPREAD AND SEARCH OFFICE TRAILER/GENER. 1 AT A MANAGABLE RATE AT THE CARGO BOXES 3 TRANSFER STATION LOCATED AT THE FLAT TRUCK TOP OF TULLY ROAD PUMP 2

Description of Work: COMPLETED WORK:_____________________________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX (NORTH TOWER) MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA___________________________________ CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE

LOADS OUT: YUKES: T DOT LOADS; GRACE CONTRACTING CORP Approved By: BY: Title: For; SUPERINTENDENT

DAILY WORK FORCE REPORT0201N.xls

CONF I DENTIEIIY,_2 IMC1 0 0_0 03416062

SUBJECT TO PROTECTTVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000237688

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000237688Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →