NYC 9/11 Public Portal Document
Page J
yirc ASSOCIATES ING. BATCH NO,
BULK SAMPLE DATA AND CHAIN OF CUSTODY FORM
PROJECT INFORMATION
1. Client: NYC-BOE 2. Project Nam AUER,A REINSPECTION 3, Project# 14584-OS/^ 4, Project Manager: ANDREAS ANDREOU
2a. Project Address:201 Warren Street, New York, NY 102S2 4a. InvestigatorY. Efstathiou/ H. Antonyan
6. Building Nanie:P.S. 89M S. Tuniaround Time: Comments (Field): a
I □ STAT □ 24 HRS □ 72 HRS OTHER
7. .Sampling Areas: Entire 10 Time11/7 Time out:
□ 6 HRS Q 48 HOURS Q NORMAL
SAMPLE ID MATERIAL LOCATION FLOOR RESULTS
H.O NUMBER DESCRIPTION NUMBER
PS 89M -11/2-0/ L^cxtYA ct-z-tA- V<s5+ri)cd£^
PS89M -11/2-
Settled Dust - ^^4,0-Ur NO
St Settled Dust
PS 89M - 11/2 -
Settled Dust ____________
PS89M -11/2- z5Yc/^ 4^
Bulk Settled Dust S id'S
PS 89M - 11/2 -
Settled Dust
PS SVM - H/2 -
Settled Dust ND
PS 89M -11/2-
2. PS 89M - I LG -
Settled Dust
d Settled Dust /Vp
PS 89M - i 1/2 - /1^Z7Xc2^Z^L</£3A /Z'-'/z
Settled Dust /h! ____ _
PS 3yM ■ 11/2 -
Bulk Settled Dust ND
CHAIN OF CUSTODY
17. Relinquished By: IS. Date: 19. Time: 20. Received By: 21. Date: 22. Time 23. Methodot'
Submittal:
7
, ZrzvZ'Zii'Z.i^ // c/ A J®
FIELD
WALKIN'
US MAIL
FED-X
OTHER
LAB INFORMATION
}24. .Name and Signature: 25. Date; 2b Time I 27. Comments (Lab):
24a. Analyzed By: A
24b. Analyzed By:
24c. DC By:
Filename: P;\USER.S\DATA\U'P96WP\FpRMS'.NY-I3.XLS l-onr, MY-13
CONFIDENTIAL, SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008 CITY_21 MC100_014660037
NYC-WTC_00023701 1
OCR can misread numbers and units. Confirm readings against the page image before using them.