NYC 9/11 Public Portal Document
Page of
ATC ASSOCIATES INC. BATCH NO.
BULK SAMPLE DATA AND CH-AIN OF CUSTODY FORM
PROJECT INFORMATION
I. Client: NYC - BOE 2. Project Nam AHERA R.E1NSPECTION 3. Project# 14584-08H 4. Project Manager: ANDREAS ANDREOU
23. Project Address;2()I Waren Street, New York, NY I02S2 4a Investigator:Y Efttathiou / H. Antonyan
5. Date: •• 6. Buildins NameiP.S. 89M 8. Turnaround Time: Si Comments (Field): ,« f T
I
7. Sampling Areas: Entire
□ STAT □ 24 HRS □ 72 HRS OTHER
'to. rime jiyf Time out:
Q 6 HRS □ 48 HOURS Q NORMAL
Kj£
SAMPLE ID MATERIAL LOCATION FLOOR RESULTS
H.A.# NUMBER DESCRIPTION N LIMBER
PS89M - 11/2-
Bulk-3 I Settled Dust -r^c4k2_
PS S9M -11/2 -
o-^dt
3 PS89M -Tl/2-
Settled Dust ■/er- fl nr-.
Ke_- ft
3 PS89M -11/2-
Settled Dust ND
Bulk - Settled Dust
PS89M -li/2 -
Bulk - Settled Dust
PS 89M - 11/2 -
Bulk - Settled Dust
PS S9M -11/2-
Bulk- Settled Dust
PS 89.M - 11/2 -
Bulk- Settled Dust
PS S9M - 11/2-
Bulk - Settled Dust
PS SyM - 11/2 -
Bulk- Settled Dust
CHAIN OF CUSTODY
17. Relinquished By: IS. Date: 19. Time: 20. Received By: ' 21 Date: 22: Time:, 23. Method of
Submittal:
FIELD
/r C / WALK IN
0 A US MAIL
FSD-X
OTHER
LAB INFORMATION
2.4 Name and Signature: 25. Date: 26. Time: 27. Comments (Lab):
24a. Analyzed Bv. 3 /r ■—at. f
24b. Analyzed By:
T~
24c. QC By:
Fiienai.ie P:\lJ.SERS\DATA\WP96\Wr\rORMS\NY-l3..KL.S .Form NS'-13
CONFIDENTIAL, SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008 CITY_21 MC100_014660038
NYC-WTC_000237012
OCR can misread numbers and units. Confirm readings against the page image before using them.