Re: Report of Environmental Monitoring of Carpet Removal at 100 Church Street
TRC Project Number 35052-0000-00007
Dear Mr. Mills:
TRC Engineers, Inc. (TRC) is pleased to present the following report of environmental monitoring for
carpet removal performed on floors 2 through 6 at 100 Church Street.
1.0 Introduction
As a result of the dust generated by the collapse of buildings on September 11, 2001 at the World Trade
Center, asbestos dust was found in the carpeting inside the New York City Law Department’s office
space at 100 Church Street, New York, New York. The NYCLD retained Cambridge Carpets
(Cambridge) to remove and replace the carpeting on floors 2 through 6, and retained TRC to perform
environmental monitoring during the carpet replacement and associated furniture cleaning.
The carpeting in the NYCLD space had been glued to the substrate. As part of the carpet removal
procedures, Cambridge applied a mastic release agent to the top of the carpeting to penetrate the carpet
and dissolve the underlying glue, so that the carpeting could be pulled up from the substrate. This mastic
release agent also acted as a wetting agent to minimize the release of fibers during carpet removal
activities.
As part of the project, Cambridge also wet-wiped all office furniture prior to installation on new
carpeting. The detailed wet-wiping procedure, which is included as an attachment to this report, involved
using rags or sponges saturated with amended water (water mixed with a detergent). Cambridge wet-
wiped the furniture until no visible dust remained.
134 West 29th Street, 1 1th Floor • New York, New York 10001
Telephone 212-563-3933 • Fox 212-349-4648
NYC-WTC_000235440
OCR can misread numbers and units. Confirm readings against the page image before using them.