by the contractor for the p 'orr^n A orwork prior to oommencing
field sampling activities.
Field Data Verification - The contractor will review all field documentation, COC forms, sample
labels and any additional field information for accuracy at the end of each days sampling
activities and prior to the shipment of samples to the contract laboratory.
TASK 4: Training:
The contractor shall ensure that all employees performing work under this contract have been
provided any and all health & safety training required by law or regulation, or EPA regional
policy.
EPA requires that all personnel performing field work under this contract receive specific training
covering all aspects of the field work, including equipment operation and maintenance.
The contractor shall document and maintain records of all appropriate field and health and
safety training for all employees performing work under this contract
TASK 6: Monitoring Site Reconnaissance:
Measure and record any obstructions and the distances and heights of any objects,
including collocated samplers, that extend at least as high as the sample inlet and are
within 1 m of the sample inlet; record descriptions of the obstructions.
Note any occurrences or circumstances that may or could effect air or wipe samples
(e.g., construction, renovation, nearness to gas combustion(cooking)).
Deliverables
The Contractor shall make site observation notes in the comments section provided on the COC
form and in the daily field sampling log.
Reporting and Communication Requirements
The following reports shall be prepared by the contractor and distributed to the designated
recipients in accordance with each specified requirement. Times are specified in the calendar
periods. Reports submitted under this contract shall cite the contract number in addition to
identifying the Environmental Protection Agency (EPA) as the sponsoring agency.
Technical Reports
Documents/reports required in the performance of contract activities shall be submitted by the
contractor to the Project Officer (i.e. Productivity Reports, QA/QC Reports, Weekly Project Status
Reports..etc)
Health and Safety Plans
The contractor shall prepare a project specific Health and Safety Program Plan that complies
with State and Federal Requirements. A copy of the Health and Safety Plan shall be submitted
CITY_21MC100_006455518