NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 9 pages

NYC-WTC_000199865

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000199865–000199873
Page image
Scanned page image, NYC-WTC_000199868
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

by the contractor for the performance of work specified in this contract prior to commencing field sampling activities.

Field Data Verification - The contractor will review all field documentation, COC forms, sample labels and any additional field information for accuracy of the end of each days sampling activities and prior to the shipment of samples to the contract laboratory.

TASK 4: Training:

The contractor shall ensure that all employees performing work under this contract have been provided any and all health & safety training required by law or regulation, or EPA regional policy.

EPA requires that all personnel performing field work under this contract receive specific training covering all aspects of the field work, including equipment operation and maintenance.

The contractor shall document and maintain records of all appropriate field and health and safety training for all employees performing work under tfiis contract

TASK 6: Monitoring Site Reconnaissance:

Measure and record any obstructions and the distances and heights of any objects, including collocated samplers, that extend at least as high as the sample inlet and are within 1 m of the sample inlet: record descriptions of the obstructions.

Note any occurrences or circumstances the t may or could effect air or wipe samples (e.g., construction, renovation, nearness to gas combustion(cooking)). Peliyergbl^

The Contractor shall make site observation notes in the comments section provided on the COC form and iri the daily field sampling log.

Reporting and Communication Requirements The following reports shall be prepared by the controctor and distributed to the designated recipients in accordance with each specified requirement. Times are specified in the calendar periods. Reports submitted under this contract shot cite Ihe contract number in addition to identifying the Environmental Protection Agency (EPA) as the sponsoring agency.

Technical Reports

Documents/reports required in the performonce of contnact activities shall be submitted by the contractor to the Project Officer (i.e. Productivity Reports, QA/QC Reports, Weekly Project Status Reports..etc)

Health and Safety Plans

The contractor shall prepare a project specific Hea th and Safety Program Plan that complies with State and Federal Requirements. A copy of the Health and Safety Plan shall be submitted to the Project Officer within ten (10) days following contract award.

CITY_21MC100_003052785

NYC-WTC_000199868

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000199868Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →