NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

NYC-WTC_000232347

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000232347
Page image
Scanned page image, NYC-WTC_000232347
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ET ENVIRONMENTAL PLAN - OF - ACTION

initial Dermal and Inhalation Hazard Exposure Assessment: Characterization of the Chemical and Physical Nature of Surface Residues and Measurement of Airborne Hazards Resulting from the Building Fire and Collapse at the World Trade Center.

The following is an abbreviated outline of a plan designed to assess potential dermal and inhalation exposure to hazards present in the air and on surfaces at the damaged World Trade Center (WTC). The goal of this plan is to provide Turner Construction Company (TCCO) site condition information related to issues of health and safety as TCCO and their contractors enter and work in and around damaged WTC structures. The technical approach of this plan is to characterize the chemical and physical nature of settled residues on building surfaces in a few representative areas and to simultaneously measure a predetermined target profile of airborne hazards. The objective of characterizing the surface residue is to confirm the expected conditions and to identify unanticipated conditions if they are present. The objective of measuring airborne hazards is to provide an immediate indication of relative health risk for persons entering and working in the areas of damaged WTC structures. The following describes our Plan of Action;

(1) Mobilization to the Project Site and Sample Collection ET Environmental will mobilize a sufficient number of professionals necessary to collect airborne and settled residue samples. Based on recent discussions, ET will be prepared to collect approximately five (5) to ten (10) residue samples, and approximately twenty (20) area samples. These samples will be analyzed for constituents described in item two (2) below, at a cost as described in item (4) below. The project, as we understand it, will consist of mobilizing one (1) or two (2) senior industrial hygienists, for the purpose of collecting samples and evaluating site conditions. Beginning on Monday, September 24'*' - 2001, it may be necessary to utilize additional labor to assist in the sample collection and define baseline data. Any additional labor that will be required to complete this task, will consist of junior level industrial hygienists and/or field technicians. ALL SCHEDULED MAN POWER LOADING FOR THE PROJECT WILL BE COORDINATED THROUGH TURNER.

Labor rates to be used for this project are as follows; POSITION RATBHr RESPONSIBILITY______________________ Serves as the “Project Administrator", or Principal $165 principal of ET (necessary for lager remediation projects).____ Serves as the “Project Manager” and will be the project representative in direct contact with Turner safety personnel. Provides design, Senior Industrial Hygienist (CIH) $150 consultation on occupational safely and health issues, and manage the field work through Turner. Coordinate all personnel activities and man power loading as required by Turner.____ Collect multiple samples of air and residue, utilize direct reading instruments, conduct fit Industrial Hygienist (junior level) $100 testing (if necessary). All work will be coordinated under the direction if the senior industrial hygienist.____________ __________ Coordinate the use of water, power, and any supplies necessary to perform the work. Deliver Field Technician $80 samples to laboratory for analysis. All work will be coordinated under the direction if the senior industrial hygienist.______________________ Accountant/Administration $75 Process pay applications & invoices from subs Word Processing $40 Prepared reports & office administration

Q2.004467 CITY_21MC100_013430886

NYC-WTC_000232347

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000232347Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

Health and Safety Plan, June 2005 · Box DEP Box 52

NYC-WTC_000127738

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Similar document embedding; no shared entity or topic indexed. · similarity 0.884

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Similar indexed content

Compare copies and versions →