NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
18 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document I Search - 1 Result - APPENDIX A TO SUBPART E - INTERIM TRANSMISSION ELEC...Page 7 of 38
maintained, and the dates of calibration and the values obtained must be recorded. The frequency of calibration depends on the past history of the particular microscope. After any maintenance of the microscope that involved adjustment of the power supplied to the lenses or the high-voltage system or the mechanical disassembly of the electron optical column apart from filament exchange, the magnification must be recalibrated. Before the TEM calibration is performed, the analyst must ensure that the cross grating replica is placed at the same distance from the objective lens as the specimens are. For instruments that incorporate an eucentric tilting specimen stage, all specimens and the cross grating replica must be placed at the eucentric position.
4. While not required on every microscope in the laboratory, the laboratory must have either one microscope equipped with energy dispersive X-ray analysis or access to an equivalent system on a TEM in another laboratory.
5. Microscope settings: 80-120 kV, grid assessment 250-1,OOOX, then 15,000-20,OOOX screen magnification for analysis.
6. Approximately one-half (0.5) of the pre-determined sample area to be analyzed shall be performed on one sample grid preparation and the remaining half on a second sample grid preparation.
7. Individual grid openings with greater than 5 percent openings (holes) or covered with greater than 25 percent particulate matter or obviously having nonuniform loading must not be analyzed.
8. Reject the grid if;
a. Less than 50 percent of the grid openings covered by the replica are intact.
b. The replica is doubled or folded.
c. The replica is too dark because of incomplete dissoulution of the filter.
9. Recording Rules.
a. Any continuous grouping of particles in which an asbestos fiber with an aspect ration greater than or equal to 5:1 and a length greater than or equal to 0.5 pm is detected shall be recorded on the count sheet. These will be designated asbestos structures and will be classified as fibers, bundles, clusters, or matrices. Record as individual fibers any contiguous grouping having 0, 1, or 2 definable intersections. Groupings having more than 2 intersections are to be described as cluster or matrix. An intersection is a non-parallel touching or crossing of fibers, with the projection having an aspect ratio of 5:1 or greater. See the following Figure 2:
♦ DisDla^Llinage
♦ Display Image
i. Fiber. A structure having a minimum length greater than or equal to 0.5 pm and an aspect ratio (length to width) of 5:1 or greater and substantially parallel sides. Note the appearance of the end of the fiber, i.e., whether it is flat, rounded or dovetailed.
http;//lexis/research/retrieve?_m=el35f2ca3d266867e53d261df3205722&_fmtsti=FULL<S... 02/04/2002
CITY_21MC100_012558671
NYC-WTC_000219931
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
18 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149346
A chain of custody cover sheet for air monitoring samples sent to the EPA Region 1 laboratory in January 2003.
15 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
12 shared non-person entities · 1 shared topics · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138897
Internal DEP coordination regarding comments on 114 Liberty procedures and preparation of a response.
6 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000186500
Notice of mandatory pre-bid meeting and background information regarding interior asbestos abatement and monitoring at 114 Liberty Street scheduled for February 2003.
5 shared non-person entities · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗6 shared non-person entities · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
Similarity score 0.964 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
Similarity score 0.958 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149346
A chain of custody cover sheet for air monitoring samples sent to the EPA Region 1 laboratory in January 2003.
Similarity score 0.958 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Similarity score 0.946 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
Similar indexed content
NYC-WTC_000149346
A chain of custody cover sheet for air monitoring samples sent to the EPA Region 1 laboratory in January 2003.
Similar indexed content
NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Similar indexed content
Similar indexed content
Similar indexed content