NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
23 shared non-person entities · Same agency, volume and box · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗A chain of custody cover sheet for air monitoring samples sent to the EPA Region 1 laboratory in January 2003.
NYC-WTC_000149346–000149430Folder label: “AIR MONITORING - LAB”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Environmental Protection Agency n. 763, Subpt. E, App. A known weight of a collapsed filter be estab be metric). A logbook must be maintained. lished and that the etching rate be cal and the dates of calibration and the values culated In terms of micrometers per second. obtained must be recorded. The frequency of The actual etching time used for the particu calibration depends on the past history of late asher and operating conditions will then the particular microscope. After any mainte be set such that a 1-2 pm (10 percent) layer nance of the microscope that Involved ad of collapsed surface will be removed. justment of the power supplied to the lenses 111. Procedures as described In Unit III. or or the high-voltage system or the mechan other equivalent methods may be used to ical disassembly of the electron optical col prepare samples. umn apart from filament exchange, the mag nification must be recalibrated. Before the F. TEM Method TEM calibration is performed, the analyst 1. An 80-120 kV TEM capable of performing must ensure that the cross grating replica is electron diffraction with a fluorescent screen placed at the same distance from the objec inscribed with calibrated gradations is re tive lens as the specimens are. For instru quired. If the TEM is equipped with EDXA it ments that incorporate a eucentric tilting must either have a STEM attachment or be specimen stage, all specimens and the cross capable of producing a spot less than 250 nm grating replica must be placed at the in diameter at crossover. The microscope eucentric position. shall be calibrated routinely for magnifica 4. While not required on every microscope tion and camera constant. in the laboratory, the laboratory must have 2. Determination of Camera Constant and ED either one microscope equipped with energy Pattern Analysis. The camera length of the dispersive X-ray analysis or access to an TEM in ED operating mode must be cali equivalent system on a TEM in another lab brated before ED patterns on unknown sam oratory. ples are observed. This can be achieved by 5. Microscope settings; 80-120 kV. grid as using a carbon-coated grid on which a thin sessment 250-1.000X. then 15.000-20.000x film of gold has been sputtered or evapo screen magnification for analysis. rated. A thin film of gold Is evaporated on 6. Approximately one-half (0.5) of the pre the specimen TEM grid to obtain zone-axis determined sample area to be analyzed shall ED patterns superimposed with a ring pat be performed on one sample grid preparation tern from the polycrystalline gold film. In and the remaining half on a second sample practice, it Is desirable to optimize the grid preparation. thickness of the gold film so that only one or 7. Individual grid openings with greater two sharp rings are obtained on the super than 5 percent openings (holes) or covered imposed ED pattern. Thicker gold film would with greater than 25 percent particulate normally give multiple gold rings, but it will matter or obviously having nonuniform load tend to mask weaker diffraction spots from ing must not be analyzed. the unknown fibrous particulate. Since the 8. Reject the grid If: unknown d-spaclngs of most Interest in as a. Less than 50 percent of the grid openings bestos analysis are those which lie closest to covered by the replica are Intact. the transmitted beam, multiple gold rings b. The replica is doubled or folded. are unnecessary on zone-axis ED patterns. c. The replica is too dark because of incom An average camera constant using multiple plete dissolution of the filter. gold rings can be determined. The camera 9. Recording Pules. constant Is one-half the diameter of the a. Any continuous grouping of particles In rings times the Interplanar spacing of the which an asbestos fiber with an aspect ratio ring being measured. greater than or equal to 5:1 and a length 3. Magnification Calibration. The magnifica greater than or equal to 0.5 pm is detected tion calibration must be done at the fluores shall be recorded on the count sheet. These cent screen. The TEM must be calibrated at will be designated asbestos structures and the grid opening magnification (if used) and will be classified as fibers, bundles, clusters. also at the magnification used for fiber or matrices. Record as Individual fibers any counting. This is performed with a cross contiguous grouping having 0. 1. or 2 defin grating replica (e.g.. one containing 2.160 able intersections. Groupings having more lines/mm). Define a field of view on the fluo than 2 intersections are to be described as rescent screen either by markings or phys cluster or matrix. An Intersection Is a non ical boundaries. The field of view must be parallel touching or crossing of fibers, with measurable or previously Inscribed with a the projection having an aspect ratio of 5:1 scale or concentric circles (all scales should or greater. See the following Figure 2:
675
NYC-VVTC_000149401
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
23 shared non-person entities · Same agency, volume and box · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
19 shared non-person entities · Same agency, volume and box · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139257
DEP official requests final review of the latest air monitoring Scope of Work to conclude negotiations.
30 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
24 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154652
Internal tracking document for managing reports, comments, and actions related to environmental compliance cases.
11 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138897
Internal DEP coordination regarding comments on 114 Liberty procedures and preparation of a response.
16 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗15 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155174
Chain of custody documentation for cleanup and monitoring samples at 114 Liberty distributed among project team members.
16 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
14 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000148952
Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Cited alongside this record in an Ask answer
NYC-WTC_000108315
Transmission electron microscopy air monitoring report for asbestos analysis at townhouses, November 2001.
Cited alongside this record in an Ask answer
NYC-WTC_000109351
October 2001 TEM air monitoring inspection report for common areas and apartments at 310 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000161139
Distribution list coordinating World Trade Center environmental response among EPA, DEC, FEMA, OSHA, CDC, and city agencies.
Cited alongside this record in an Ask answer