NYC 9/11 Public Portal Document
DMFT^ New York City Department of Environmental Protection Bureau of Environmental Compliance
Monitoring Contractor Scope of Work for 114 Liberty Street, Manhattan
Background
A follow-up visit to 114 Liberty Street revealed minor dust accumulations present on surfaces within the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor and monitored by a Monitoring Contractor.
Purpose
The Monitoring Contractor shall provide personnel experienced, trained, and certified in environmental sampling and asbestos air monitoring to be on-site, full-time, during work area preparation and cleaning phases of building interiors (12 stories -5,000 to 6,000 square feet per floor). Each apartment occupies an entire floor with the exception of the top floor that is a duplex and the apartment on the third floor that shares the floor with two commercial spaces. The entire interior of the building (residential, commercial, retail spaces, common spaces, etc.) is included in this work. Each floor has central HVAC systems.
The Monitoring Contractor shall provide qualified staff to observe the work, conduct air monitoring and sampling, and monitor the cleanup of the building interiors to ensure compliance with the project specifications and appropriate regulatory requirements. The Monitoring Contractor shall provide clearance sampling and analyses.
The Monitoring Contractor shall provide qualified staff to collect samples for asbestos, lead, polyaromatic hydrocarbons (PAHs), dioxin, fibrous glass, and crystalline silica.
An accredited laboratory shall perform all sample analyses.
The Work shall be performed 24 hours per day, seven (7) days per week. Pre-clean up sampling must begin within 24 hours of receipt of the Commence fVork letter. All pre-clean up samples must be completed and submitted to the laboratory for analysis within 48 hours.
Air Monitoring/Construction Inspection Services
Air monitoring by a Monitoring Contractor shall be conducted during all cleanup activities. The Monitoring Contractor shall provide individuals certified as project monitors and air sampling technicians to perform daily air sampling and inspections from the commencement of the project through final clearance sampling. The Monitoring Contractor shall provide sufficient equipment and experienced personnel to monitor work area preparation and cleaning phases of the building interiors.
Qualifications
Project Monitoring I'he Project Monitors must posses valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects. The Project 1 of6
CITY_DEP_WORBY_CANNATA_SUBP_000020400
NYC-WTC_000209413
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
12 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
13 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162853
Discussion regarding revisions to monitoring work specifications, including flow rate issues and asbestos sampling protocols.
13 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155430
Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
13 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗13 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162815
Request for review of monitoring contractor specifications for air sampling, including sampling methodologies, limits of detection, and clearance criteria, with reference to prior…
13 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153557
Document outlining scope of work for asbestos abatement contractor and environmental monitoring at 125 Cedar Street.
12 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162853
Discussion regarding revisions to monitoring work specifications, including flow rate issues and asbestos sampling protocols.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 1 pages · confidence 0.00 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
NYC-WTC_000162853
Discussion regarding revisions to monitoring work specifications, including flow rate issues and asbestos sampling protocols.
Similar indexed content
NYC-WTC_000155430
Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
Similar indexed content
NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
Similar indexed content
Similar indexed content