4 shared non-person entities · 1 shared topics · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000200055
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000200055
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
New York City School Exhibit 1 Construction Authority (3) REQUEST FOR PAYMENT no (A) Page 1 of 1 ’ - . , 36 Contractor □ Consultant ■ Construction Manager □, ■■ Line □ " Capital Improvement □ Initial Contract Amount:$4,000,000
tc) PROJECT TITLE Asbestos Consultant Services LLW#: 28673 (i) CM/ CONTRACTOR/ GQNSHLT^NT (d) LOCATION Stuyvesant HS, 345 Chambers Street, New York, NY TAYLOR ENVIRQNMHN’ GROUP, (e) CONTRACT NO. C000008706 (f) PROJECT NUMBER M477-14413 INC. 130A JERICHO TOR (g) AWARD DATE 5/1/2001 (h) PERIOD COVERED 9/2^01-10/31/01 FLORAL PARK, NY 11001 ITEM OF WORK TOTAL VALUE Percent Total Value of VALUE OF WORK-COMFLEThU. ~ OF WORK Complete Completed Work lEQUEST TO LAST REQUEST THIS R^qO^/ Z M PI Pl w [5] [61 STAFFING Project Manager $1,400,000.00 1.98% $27,750.00 $12,900.00 $14,850.00 Project Designer $100,000.00 2.61% $2,612.50 $2,612.50 $0.00 Asbestos Investigator $500,000.00 1.61% $8,041.50 $8,041.50 $0.00 Project Monitor (AHERA Cert.) $200,000.00 3669% $73,370.00 $39,663.50 $33,706.50 NYS Inspector $20,000.00 11.88% $2,376.02 $2,376.02 $0.00 On-Site Technician $30,000.00 6.93% $2,079.00 $2,079.00 $0.00 Certified Lead Inspector $500.00 0.00% $0.00 SO.OO $0.00 TESTING Bulk Sample Analysis by PLM/DS Within 24 Hour Turnaround $40,000.00 0.70% $280.00 $280.00 $0.00 Within 6 Hour Turnaround $9,000.00 0.00% SO.OO SO.OO $0.00 Within 1 Hour Turnaround $1,000.00 0.00% $0.00 SO.OO $0.00 NOB Sample Analysis by PLAVDS Within 24 Hour Turnaround $48,500.00 3.84% $1,860.00 $1,860.00 $0.00 NOB Prep (TEM Preparation) $15,000.00 4.90% $735.00 $735.00 $0.00 NOB Sample Analysis by TEM Within 24 Hour Turnaround 5100,000.00 1.35% $1,350.00 $1,350.00 $0.00 I Airborne Fiber Analysis by PCM______ Within 24 Hour Turnaround $400,000.00 350% $14,000.00 $14,000.00 $0.00 Within 6 Hour Turnaround $200,000.00 2.58% $5,161.00 $5,161.00 $0.00 Within 1 Hour Turnaround $200,000.00 1.07% $2,144.00 $2,144.00 $0.00 Airborne Asbestos Analysis by TEM Within 24 Hour lumaround $15,000.00 52.67% $7,900.00 .$4,620.00 $3,280.00 Within 6 Hour Turnaround 5590,000.00 3.16% $18,625.00 $9,165.00 $9,460.00 Within 3 Hour Tumaround 5100,000.00 10.15% $10,150.00 $4,785.00 $5,365.00 Lead Samples Bulk Paint Chip Sample 12 Hr. TAT $2,000.00 0.00% $0.00 SO.OO $0.00 Leaddn-Dust-Wipe-Sample 6 Hr. TAT $25,000.00 0.00% $0.00 SO.OO $0.00 Miscellaneous Reimbursable Expenses: $4,000.00 0.00% $0.00 SO.OO $0.00
(7) TOTAL WITH CHANGES 54,000,000.00 4.46% $178,434.02 $111,772.52 $66,661.50 (8) LESS RETAINAGE @ % ( ______ iJ. ) ( _____ ) (9) TOTALS 54,000,000.00 4.46% $178,434.02 $111,772.52 $66,661.50 iCertificate for Payment has been completed in accordance with the Contract IDocuments and where applicable in accordance with Labor Law 220 and that the BY: DATE: zD - /‘ Icurrent payment shown herein is now due. The undersigned further certifies that all iamounts due subcontractors have been and shall be paid in full within the time Subscribed and sworn to me ispecified in Article 16 of the General Conditions. CM/Contractor/Consultant sign below: this / / day of , 2001
TERRI ANN DTLIA Notary Public. State of New TMt NO.01DE5093718 George Taylor Outfifled in Nassau County 5 ’RINT NAME DATE Commission Expires August 18,20X. ^jTsignatureofTield^epresentative PRINT NAME
(K) SIGNATURE OF PROJI ;cT leader PRINT NAME DATE/ / •f APRIL M. ALBER6HINI (L) REVIEWED BY CHECK NO. cAeck date/
CITY_21MC100_012155762
NYC-WTC_000200055
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
NYC-WTC_000108055
Asbestos Removal Corp invoice dated August 6, 2002, detailing charges for asphalt and gravel roof cleanup at 120 Liberty and 125 Cedar.
1 shared non-person entities · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154143
Contract document between the City of New York DEP and a contractor for supply and services at World Trade Center residential sites.
2 shared non-person entities · 1 shared topics · similarity 0.894
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105479
Correspondence stating that roofs at 26 Broadway were replaced post-9/11, negating need for further cleaning.
1 shared non-person entities · 1 shared topics · similarity 0.893
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108077
Asbestos Removal Corp invoice dated August 6, 2002, detailing charges for asphalt and gravel roof cleanup at 120 Liberty and 125 Cedar.
1 shared non-person entities · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108066
Asbestos Removal Corp invoice dated August 6, 2002, detailing charges for asphalt and gravel roof cleanup at 120 Liberty and 125 Cedar.
1 shared non-person entities · similarity 0.891
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102107
September 2002 final notice from DEP to building owners regarding World Trade Center debris cleanup at 21 Maiden Lane.
3 shared non-person entities · similarity 0.887
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000113295
Final notice letter from the Department of Environmental Protection dated September 3, 2002, regarding World Trade Center debris observed on 49 Warren Street.
2 shared non-person entities · similarity 0.887
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
3 shared non-person entities · similarity 0.887
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · similarity 0.884
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000120641
Laboratory report on ambient air samples collected in apartments and common areas of 333 Rector Place during September 24-26, 2001.
3 shared non-person entities · similarity 0.884
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
3 shared non-person entities · 1 shared topics · similarity 0.884
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.939 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108066
Asbestos Removal Corp invoice dated August 6, 2002, detailing charges for asphalt and gravel roof cleanup at 120 Liberty and 125 Cedar.
Similarity score 0.938 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163514
Internal DEP communication transmitting contract change orders for rooftop work requiring contractor signatures.
Similarity score 0.936 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163514
Internal DEP communication transmitting contract change orders for rooftop work requiring contractor signatures.
Similarity score 0.936 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Asbestos Removal Corp invoice dated August 6, 2002, detailing charges for asphalt and gravel roof cleanup at 120 Liberty and 125 Cedar.
Similar indexed content
NYC-WTC_000154143
Contract document between the City of New York DEP and a contractor for supply and services at World Trade Center residential sites.
Similar indexed content
NYC-WTC_000105479
Correspondence stating that roofs at 26 Broadway were replaced post-9/11, negating need for further cleaning.
Similar indexed content
NYC-WTC_000108077
Asbestos Removal Corp invoice dated August 6, 2002, detailing charges for asphalt and gravel roof cleanup at 120 Liberty and 125 Cedar.
Similar indexed content