Si.' • stabilizing in-City wastewater treatment facilities that are in need of system-wide reconstruction to ensure
their continued compliance with mandated permit requirements ($1.7 billion).
i 11
• retrofitting wastewater treatment facilities and other related projects to reduce the amount of nitrogen
discharged into New York Harbor, Jamaica Bay, and the Long Island Sound ($144.2 million).
• reconstructing or replacing individual components at in-City wastewater treatment facilities to ensure
their continuous and reliable operation ($262.2 million).
• reconstructing in-City wastewater pumping stations, regulators, tide gates, and force mains to minimize
leakage or back-ups in the sewer system ($ 178.1 million).
• implementing initiatives that address water quality problems attributable to combined sewer overflow
(CSO)'discharges into the City’s surrounding waterways during rainstorms. These include an estimated
$250.0 million in New York State funds, as part of the Clean Water/Clean Air Bond Act of 1996, for
various water quality improvement projects that are included in the Ten-Year Plan ($1.0 billion).
• remediating two closed City-owned landfills: Pennsylvania Avenue, and Brookfield Avenue Landfills.
Pennsylvania Avenue is scheduled to be remediated in 2002 and will cost $54.8 million: $8.7 million in
City funds and $46.1 million in State funds. Brookfield Avenue is scheduled to be remediated in 2004
j and will cost $66 million: $21 million in City funds and $45 million in State funds.
Major projects scheduled for 2002 include;
• continuing the Upstate land purchase program which will protect environmentally sensitive land around
the City’s reservoirs ($37.7 million).
• construction of Hillview Chlorination Buildingfor ($42.0 million).
• continuing the construction for Stage Two of City Tunnel Number 3 for 2002 ($88.8 million).
• replacing and constructing sewers ($247.1 million).
• upgrading portions of the Newtown Creek Wastewater Treatment Plant ($ 198.2 million).
i
» • retrofitting wastewater treatment facilities and other related projects to reduce the amount of nitrogen
liI
discharged into New York Harbor, Jamaica Bay, and the Long Island Sound ($18.2 million).
th
• reconstructing or replacing individual components at in-City water pollution control wastewater treatment
facilities, to ensure their continuous and reliable operation ($79.9 million).
• reconstructing in-City wastewater pumping stations, regulators, tide gates, and force mains ($123.0
million). /
• construction of various water quality improvement projects ($150.2 million) including: Alley Creek CSO
($36.5 million). Flushing Bay CSO ($50.0 million), and Paerdegat Basin CSO ($78.4 million).
• remediation of a elosed\City-owned landfill at Pennsylvania Avenue ($8.7 million GO. funds and $46.1
million State funds). i