Site journal, WTC construction, October 2001

Machine-extracted title · confidence 95%

Daily site log recording weather conditions, safety observations, and personnel activities at the World Trade Center construction site on October 4, 2001.

NYC-WTC_000186496
Page image
Scanned page image, NYC-WTC_000186496
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

^ite Safety Daily Journal (Page_i_of_2j amecP Project: WTC Date: 10/04/2001

Weather:* AM 60 °F Conditions: Sunny

PM 70 °F Conditions: sunny

Prepared by:

ENTRY STATUS DATES OBSERVATIONS AND COMMENTS Open Closed 0700 0730 Site walk no issues.

0800 0830 Corrected crane operator and iron workers about hard hats.

0900 0915 Site walk. Provided personnel with safety glasses.

1000 1030 Melofchik assisted EPA with air sampling of the big pile. Spencer from OSHA and Tony Adams from Bechtel pointed out that Articulated Rubber tired loader at Customs Building (possibly borrowed from Bovis) has a broken horn - McKeever gave the operator an air horn until loader is fixftd. SffiVft NAkAj^aki nf RftchtAl nnintAd nut that nil .Rhniilrt hA handlpd hpttpr___________ 1030 1100 Steve Nakasaki of Bechtel pointed out that waste oil should be handled better throughtout the site in either 55 gallon drums or overpacks, especially in the area of the center road. We set up an area labled used oil and placed (2) 55 gallon drums and a funnel in that area. Began to inform formen about putting oil in proper area. 1100 1200 Site Walk. Corrected people on hard hats and safety glasses. Many people from other sectors coming into AMEC sector to watch the unvailing of the memorial.

1200 1230 Site Walk. Corrected people on hard hats and sefety glasses.

1300 1400 Unveiling of the memorial at ground zero.

1430 1445 Site Walk to Pier 6. Chris Devlin inquired about additional dust suppression and additional safety vests.

1500 1515 Site walk. No issues identified, shifts beginning to change. OSHA air monitoring pumps damaged in basket.

1530 1545 Spoke with Tony Adams about iron worker riding in bucket of frontend loader. Spoke to his foreman and it has been straightened out.

1600 1645 Bectel and OSHA had issue regarding securing basket over ball.

Generated by: Safely Department Date; 05/01

CITY_21MC100_004674851

NYC-WTC_000186496

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000186496Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →