NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Permit application project monitor log for large abatement project

Machine-extracted title · confidence 90%

Application form for a permit covering a large-scale full-containment asbestos abatement project.

NYC-WTC_000177454–000177457
Page image
Scanned page image, NYC-WTC_000177456
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PROJECT MONITOR Part 2 1. Client: 2. Project Name: 3. Project Address: 4. Project #: S date: 9-2./ OJ-

PREP-INSPECTION CHECKLIST: Work Area Location: Pass Fail N/A Pass Fail N/A

1. Vacated by occupants. 8. Openings <32ft2 covered by 2 lyrs poly. 2. Warning Signs (Eng. 3p). 9. Openings >32fF covered by plywood and two layers of poly. 3. Electricity down/locked out. 10. Movable objects pre-cleaned, removed 4. Power outside work with GFI. from area. 5. HVAC off. locked-out, isolated. 11. Fixed objects pre-cleaned, plasticized. or pressurized. 6 DECONTAMINATION UNIT: 12. Floor poly 6“ onto walls (12"=NYS). 13. Wall poly to the floor. • Outside work area • CIn, shwr, eqpt rooms 14. 6" overlap between adjacent sheets of poly. • 2 layers, 6-mil wall poly 15. Elevator bypasses work area. • 2 layers, 6-mil floor poly 16. Plywood/poly barrier before elevator ■ 1 shower per 6 workers doors.

• Hot/cold waler 17. Perimeter diaphragm for elevator barrier. ■ Waste water < 5 microns 18. 4 air changes per hour from negative • Waste water sewer/drum air unit. • Soap/Shampoo 19. New filters in negative air units. • Disposable towels 20. Negative air pressure 0.02 • Waste bags 21. Minimum 2 means of exiting work area. 7. POSTINGS; 22. Toilet for abatement personnel. • Regulations 23. Waste Decon for ^1,000 ft. ACM (NYC. NYS, OSHA, EPA) 24. The following additional equipment: • Sign-in logs • 6-mil disposable bags with • Evacuation Plan warning labels • Supervisor's license • Poly and Duct Tape • Worker licenses • Fire extinguisher • ACP-7 • Approved respirator • Building Permit/Placard • Replacement filters • EPA 10-day notification • Protective Clothing • NYS Notification 25. Work area pre-cleaned • Emergency Numbers 26. Work area passes inspection Yes No • Material Data Sheets

PRE-ENCAPSULATION/HMAL INSPECTION CHECKLIST: Work Area Location: _________________ Pass Fall N/A Pass Fail N/A

1. No visible debris on walls, floors. 8. No bags of waste in work area. 2. No visible debris between decking 9. All equipment clean and beams. 10. Neg. Air > 0.02 inch, of water. 3. No visible debris behind perimeter columns. 11. Airless spray equipment used.

4. No visible debris on top of ducts. 12. Work area is dry, free of water pools.

5. No visible debris on hangers, rods, 13. The area suitable for encapsulation. lights. 14. The area suitable for final air clearance. 6. No visible debris on poly. 15. Work area passes inspection. Yes ___ No (Explain why) 7. No visible debris on pipes Form NY-9 1/01

CONFIDENTIAL, CITY_21MC100_003446252 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000177456

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000177456Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →