NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Asbestos abatement project monitor log, Sept 2002

Machine-extracted title · confidence 95%

Project monitor log form for a large asbestos abatement project at a DEP site in September 2002.

NYC-WTC_000177474–000177477
Page image
Scanned page image, NYC-WTC_000177476
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

project MONITOR LOG Part 2

1. Client: 2. Project Name; 3. Project Address: 4. Project #: 5. date:

.o P C r XU i5r cVc, rat 4a. Task #: t? ( O /<s>. PREP-INSPECTION CHECKLIST: Work Area Location: Paas Fail N/A Pass FaU N/A

1. Vacated by occupants. 8. Openings <32ft' covered by 2 lyrs poly

2. Warning Signs (Eng, Sp). 9. Openings >32ft’ covered by plywood and two layers of poly. 3. Electricity down/locked out. 10. Movable objects pre-cleaned, removed 4. Power outside work with GFI. from area. 5. HVAC off, locked-out, isolated, 11. Fixed objects pre-cleaned, plasticized. or pressurized. 12. Floor poly 6" onto walls (12"=NYS). 6. DECONTAMINATION UNIT: 13. Wall poly to the floor • Outside work area 14. 6“ overlap between adjacent sheets • CIn, shwr, eqpt rooms of poly. • 2 layers, 6-mil wall poly 15. Elevator bypasses work area. • 2 layers, 6-mil floor poly 16. Plywood/poly barrier before elevator • 1 shower per 6 workers doors.

• Hot/cold water 17. Perimeter diaphragm for elevator barrier. • Waste water < 5 microns 18. 4 air changes per hour from negative • Waste water sewer/drum air unit. • Soap/Shampoo 19. New filters in negative air units. • Disposable towels 20. Negative air pressure > 0.02 • Waste bags 21. Minimum 2 means of exiting work area. 7. POSTINGS: 22. Toilet for abatement personnel • Regulations 23. Waste Decon for >1,000 ft. ACM (NYC, NYS, OSHA, EPA) 24. The following additional equipment: • Sign-in logs • 6-mil disposable bags with • Evacuation Plan warning labels • Supervisor's license • Poly and Duct Tape • Worker licenses • Fire extinguisher • ACP-7 • Approved respirator • Building Permit/Placard • Replacement filters • EPA 10-day notification • Protective Clothing • NYS Notification 25. Work area pre-cleaned • Emergency Numbers 26. Work area passes inspection ___ Yes ____ No • Material Data Sheets

PRE-ENCAPSULATION/FINAL INSPECTION CHECKLIST: Work Area Location:

Pass Fai! N/A Pass Fail N/A

1. No visible debris on walls, floors. 8. No bags of waste in work area. 2. No visible debris between decking 9. All equipment clean. and beams. 10. Neg. Air > 0 02 inch of water. 3. No visible debris behind perimeter columns. 11. Airless spray equipment used.

4. No visible debris on top of ducts. 12. Work area is dry, free of water pools,

5. No visible debris on hangers, rods, 13. The area suitable for encapsulation. lights. 14. The area suitable for final air clearance. 6. No visible debris on poly. 15. Work area passes inspection. Yes ___ No (Explain why) 7. No visible debris on pipes. Form NY-9 1/01

CONFIDENTIAL, CITY_21MC100_003446382 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000177476

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000177476Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →