NYC-WTC_000178383
Invoice for construction management services including dewatering and slurry wall panel work at the World Trade Center site in May 2002.
1 shared topics · similarity 0.875
machine-extracted · confidence unavailable · Check page ↗Invoice dated August 21, 2002 submitted by Willis of New York Inc. to the Department of Design and Construction.
NYC-WTC_000177368–000177374
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Helmsman Management Services, Inc.® DATE: M«y30,2002 Re; ADDITIONAL EXPENSE TO BE BILLED
FORM SHOULD BE COMPLETED AND RETURNED TO CONTRACT ADMINISTRATOR IN H.O. HELMSMAN MANAGEMENT
Account Nome City of New York Department of Design and Construction Billing Contact Name (Mr /Ms/ FrankMcIntyre BiUingContant Tide)
City of New York Department of Degign and Construction c/o Willis of New York 7 Hanover Square Complete Account Addres; New York, NY 10004'2594
Helmsman Contract Number WP8-62B-0O4607-391 WZ2 (Vendor LP)
LT Rep Various Office New York
Billable Service Time
Date Visit Time in Hours 2/1S/2002 - 3/15/2002 See Below for details
Brief Description of Service Provided: [Monitoring and Equipment Fees and Expenses 1
Straitthl Time Monitoring Services Hou n/U nits Rate Actual Expenses Technician 1008 $60.00 $60,480.0< Senior Projeci Manager 160 $85.00 $13,600.0( - Certified Industrial Hvglcnist 113.5 $125.00 $14,18730 Aceount Manager 85 $115.00 $9,775.O(
Industrial Hygienist 0 S75.00 SO.OC Over Time Monitoring Services $0.00 Technician 900.5 $72.00 $64,?36.0C Industrial Hygienist 0 $90.00 $0.00 Senior Pro ject Manager 182.5 $85.00 $15,512.5t Certified Industrial Hygienist 88.5 S125.Q0 $11.052.5 C Account Manager 49 $115.00 $5,635.00 Equipment Fees & Expenses $0,00 Low Volume Sampling Pumps 384 $5,00 $l,920.0t Datalogging CO Monitors 119 $5.00 $595.OC Paint Chip Sampling Analysis 9 $25.00 $225.00 Direct Reading Instrumentation $125.00 $0,00 FedEx Shipping Charges_____ 0 $14.00 $0.00 Office Supplies......................... c S175.00 $0.00 Equipment________________ I $£74007 $4,740.07
TOTAL AMOUNT TO BE INVOICED: $202368.57
tSMS S.RI Additional Expense to be Billed
82/1 I ■ d t729PS8i2I21 01 0iei6PlC09 Ubninw Aiaaan dd 60:ei 2002 ei snw
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_013508390 SUBJECT TO RROTECTIVE ORDER NO. 2, SERT. 2008 NYC-WTC_000177372
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000178383
Invoice for construction management services including dewatering and slurry wall panel work at the World Trade Center site in May 2002.
1 shared topics · similarity 0.875
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143653
Invoice detailing fees for the World Trade Center hotline project including distribution of materials and service costs.
1 shared topics · similarity 0.876
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000106161
Mott & Prince Management letter dated March 14, 2002, responding to DEP inquiries about maintenance and re-occupancy at 114 Chambers Street.
1 shared topics · similarity 0.872
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108368
Letter from Mott & Prince Management responding to DEP inquiries about maintenance and re-occupancy at several buildings.
1 shared topics · similarity 0.871
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167253
Fax transmission of a revised proposal document regarding architectural and engineering design services for the Mayor's Office of Emergency Management.
1 shared topics · similarity 0.869
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163150
Confirmation of invoice breakdowns matching bid sheets for additional samples collected during the project.
Similar document embedding; no shared entity or topic indexed. · similarity 0.869
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140887
Draft proposal requesting FEMA funds to establish an office coordinating NYCDOH's participation in WTC environmental response efforts.
1 shared topics · similarity 0.869
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105155
Invoice enclosing bulk sample results, air monitoring data, and cleanup summaries for 17 Battery Place.
Similar document embedding; no shared entity or topic indexed. · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108377
Letter from Mott & Prince Management regarding maintenance and re-occupancy issues at several buildings after the WTC collapse.
1 shared topics · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171607
Ambassador Construction submits Change Order #105 for audiovisual expansion work at the Mayor's Office of Emergency Management.
Similar document embedding; no shared entity or topic indexed. · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗Similar document embedding; no shared entity or topic indexed. · similarity 0.867
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104836
Letter enclosing invoices and reports regarding structural inspections and cleanup at 98 Greenwich Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.866
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000167590
Invoice for audiovisual and acoustics technology consulting services for Mayor's Office of Emergency Management project.
Similarity score 0.910 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178383
Invoice for construction management services including dewatering and slurry wall panel work at the World Trade Center site in May 2002.
Similarity score 0.907 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.907 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.907 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167503
Invoice for architectural controlled inspections at the Mayor's Office of Emergency Management project dated January 25, 1999.
Similarity score 0.906 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141668
Equipment summary record listing gas detectors and mercury vapor analyzers used for perimeter air monitoring around the site.
Similarity score 0.906 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000143653
Invoice detailing fees for the World Trade Center hotline project including distribution of materials and service costs.
Similar indexed content
NYC-WTC_000178383
Invoice for construction management services including dewatering and slurry wall panel work at the World Trade Center site in May 2002.
Similar indexed content
NYC-WTC_000106161
Mott & Prince Management letter dated March 14, 2002, responding to DEP inquiries about maintenance and re-occupancy at 114 Chambers Street.
Similar indexed content
NYC-WTC_000108368
Letter from Mott & Prince Management responding to DEP inquiries about maintenance and re-occupancy at several buildings.
Similar indexed content
NYC-WTC_000167253
Fax transmission of a revised proposal document regarding architectural and engineering design services for the Mayor's Office of Emergency Management.
Similar indexed content