Environmental monitoring correspondence regarding remediation contractor, March 2003

Machine-extracted title · confidence 85%

Correspondence from an environmental firm dated March 2003 reviewing qualifications and invoices for a remediation contractor.

NYC-WTC_000174291–000174309
Page image
Scanned page image, NYC-WTC_000174299
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

TA TASSOCIATES hacher reportedly not paid, were made, and in some instances resulted in the employee being paid twice for the same work performed. Also, payroll corrections resulting in back-out adjustments appear to be consistently excluded from the project totals.

g. Safeway invoiced for clerical services performed at the project site. In accordance with the DDC policy, clerical services are part of the Contractor’s overhead. This resulted in an overcharge of $1,503.24.

h. Safeway invoiced for supervisory personnel (other than licensed Asbestos Supervisors) who, in accordance with DDC’s policy, are part of the Contractor’s overhead. This resulted in an overcharge of $19,874.52.

Materials

TA reviewed back-up documentation pertaining to materials purchased and invoiced to the project. Due to the complexity of the project, tracking of the used materials retroactively is difficult, if at all possible. TA did, however, review the rates charged and was able to determine that Safeway’s charges appeared to be reasonable.

Equipment

a. Safeway billed for waste disposal at cost, plus 10% and 5% (Requisition #24) and cost, plus 10% and 10% (Requisition #21). Waste disposal by other tier contractors should be invoiced at cost, plus 5%. This resulted in an overcharge of $44,335.38.

b. Safeway double billed for services sub-contracted from Strong Equipment. The same invoice appears in two (2) requisitions. This resulted in an overcharge of $4,109.57.

Medical

Safeway invoiced for various medical screening for workers. TA is of the opinion that environmental remediation is a “unique industry” requiring Periodic Medical Surveillance for workers and should be built into the Contractor’s overhead. This resulted in an overcharge of $13,493.81.

Insurance

Safeway invoiced the project for Asbestos Liability Insurance in Requisition 21. In accordance with a DDC Memo, all contractors employed on this project were covered under a general site-wide liability insurance policy and therefore were exempt from purchasing individual liability insurance. In response to TA’s inquiry relative to the issue of insurance charges, Safeway stated that, “To date we have not received any type of confirmation of denial. Until we have actual

9

NYC-WTC_000174299

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000174299Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →