NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/7DCAS/Mayor's Office of Emergency Management Project
Document / 1 page

Project schedule for Mayor's Office of Emergency Management, Oct 1998

Machine-extracted title · confidence 92%

Timeline tracking project milestones and vendor activities for the Mayor's Office of Emergency Management installation.

NYC-WTC_000173794

Folder label: “Mayor's Office of Emergency Management Project”

Page image
Scanned page image, NYC-WTC_000173794
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Mayors Office of Emergency Management Project September October November December January ID Task Name Duration Start 8/30 I 9/6 I 9/13 I 9/20 | 9/27 | 10/4 | 10/11 | 10/18 | 10/25 11/1 Lil'S [11/15 J 11/22 j 11/29j 12/6 L12/13 L 12/20 j 12/27 J 1/3 J 1/10 | 1/17 1 Purchase Order Approved Id 9/1/98 Hem 2 Order Material Id 9/4/98 ^-Engineering

3 Material Delivery 60d 9/7/98 |-|Motorola

4 Develop site Drawings 30d 9/7/98 |ram Manager

5 cost Staging 29d 11/2/98

6 CCSI staging Build 25d 11/2/98 [-Motorola

7 CCSI Customer Demo 2d 12/7/98 ^J-|OEM,Motorola

8 Ship to #7 WTC/Sites AS 2d 12/9/98 ^Motorola

9 #7 me 23 Floor- WC 65d 10/2/98

10 Site Hreparaton 50d 10/2/98 imuels,Motorola,Swanki

11 Install CEB Room lOd 12/11/98 Samuels, =SO, Motorola

12 Install 4 Console Furnitur 8d 11/27/98 muels,Motorola,FSO

13 Install 3 Console Electro lOd 12/11/98 FSO,Mot( rola

14 Install Premisys in LAN 5d 12/11/98 ^Motorola

15 Install RCH3000 units lOd 12/18/98 F 3O,Motorola

16 #7 WTC Root Radio Room// 49d 10/19/98

17 Site Prep at #7 WTC Rot 30d 10/19/98 Swanke,Samu< Is

18 Install Electrical on roof lOd 10/19/98 Samuels,Motorola

19 Install Antenna Mounts a lOd 10/19/98 imuels,Motorola

20 Install Ant and lines at #7 5d 11/2/98 Samuels,Motorola

21 Install radios on Roof lOd 12/11/98 FSO,Mot( rola

22 Install riser cables 5d 10/19/98 n Samuels,Motorola

23 System Optimization lOd 1/1/99 ,FSO,Mol

24 Training 3d 1/15/99 Mo

25 Acceptance Testing 5d 1/15/99

26 Final Sign Off Id 1/22/99

Task Milestone Rolled Up Task Project: NYC Mayor's OEM Project Date: 8/3/98 Progress Summary Rolled Up Milestone O

Prepared by Robert Hudson Page 1

NYC-WTC_000173794

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173794Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

RFI log for 7 WTC EOC project, Aug 1998 · Box 7DCAS

NYC-WTC_000173575

Request for Information log documenting responses to queries about wall offsets and electrical outlet locations at the Mayor's Office of Emergency Management.

1 shared non-person entities · Same agency, volume and box · similarity 0.895

machine-extracted · confidence unavailable · Check page ↗
Fax transmission log for 7 WTC project, Jan 1995 · Box 7DCAS

NYC-WTC_000173652

Log of incoming and outgoing faxes between Ambassador Construction and the Office of Emergency Management regarding project communications.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.893

machine-extracted · confidence unavailable · Check page ↗
RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.891

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →