PROJECT.
MINUTES OF CONSULTANPS MEETING #1
Mayor's Office of Emergency Management
7 World Trade Center
1, 7. & 23rd Floors
Amb, Job #557.5175
DATE: July 21,1998
PRESENT; Jay Koven Ambassador
Martin Scbneider Ambassador
Jack Klein Ambassador
Mark Torre Silverstein Properties
Walter Weems Silverstein Properties
Glenn Pymento DCAS
Bob Meianiff DITT
Josep Domingvez DCAS
Juan Mejia Swanke Hayden Connell
1.SHOP.QRAWING STATUS
- Ambassador advised that they are waiting for return of HVAC equipment drawing,
— t c fi advised that drawing would be returned 7/21/98
— " Ambassador advised that duct drawing for first quadrant have been submitted and
K' the other (3) are to be submitted by 7/25/98. Ambassador requested a rush on
EkcVvic Panel, approval. —■
2. PROJECT STATUS
- Ambassador advised that wall layout has started, studding would begin this week
- Ambassador advised that Port Authority has been notified of start
- Swanke advised that the drawing reflecting Port Authority changes amj hurricane wall
Will be released next week, Ambassador to review and advise of all cost and time M
rnplicaltons __jjp,(k,/L.S
3 RFl STATUS
#1 ■ Status of wall interference at E.O.C. room with return air duct;
Cosentini is to review if duct is necessary.
- RFl #2; Wet column interference with hallway adjacent to Room 23-43: —
Resolved, sketch from Swanke to follow.
- RFl #3; 7A door problem with blast proofing and EMI shield: —
Swanke advised that EMI shield can be applied to outside of door. Ambassador to
coordinate.