MINUTES OF CONSULTANT'S MEETING #6
PROJECT: Mayor's Office of Emergency Management
7 World Trade Center
1.7 & 23rd Floors
Amb. Job #857-5175
DATE; August 25, 1998
PRESENT: Mark I orre Silverstein Properties
Walter Weems Silverstein Properties
Manin Schneider Ambassador
Jack Klein Ambassador
Glenn Pymento DCAS
Bob Mela niff □ITT
Bob Hudson Motorola
Juan Mejia Swanks Hayden Connell
John Hughes O.E.M
1. SHOP DRAWING STATUS
- Critical shop drawings out for review.
Light fixtures
Overly doors
Mecho Shades
2900Amp Panel
Duct Drawing A-7-1
ATy Enclosures
2. PROJECT STATUS
- Ambassador advised tfiat substarrtiai completion of the 23rd Floor is the 1 st week of
November.
■ Ambassador advised of the following:
Layout and framing is 90% complete.
Drywall installation is approximately 35% comoiete,
Sprinkler niain and branches is 60% complete
Condenser water piping is 70% compete.
Plumbing drain work on the 22nd Floor is 60% complete.
Black, iron for ceiling is 25% complete.
- Started blind pockets and drywall fascia at perimeter.
- 7th Floor temporary demising wall Is complete.
- 7th Floor demolition is scheduled for Tuesday, 8/25/98
- 1st Floor work to be started the week of 8/25/93
- Electrlcai roughing on 23rd Floor is 60% complete.
- Riser core work is approximately 70% compelete
- Riser work is 20% complete.