NYC-WTC_000117805
Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
1 shared topics · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗Correspondence from a technology firm detailing the routing of data and telephone cables through the 23rd floor for the Mayor's Office of Emergency Management.
NYC-WTC_000173641–000173642Folder label: “Date and Telephone Cable Installation for OEM”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DEPARTMENT OF WORMATION TECHNOLOGY [CATIONS Mr I Ddrrr aiCImmheR Sneet S«ite932 ’I jK 2 Rocms NewYoiKMYJOOW (212)7M-2330 Fix:(aU)7M-2331 t L^t<2 - October 9,1998 To: Jack Klein Ambassador Construction
From: Bob Melanifi: iL^ i >
Subject: Data and Telephone Cable Installation for QEM at 7 World Trade Center \
As you requested, attaclied is an outline of how we will be running data and te lephone cables through the 23'^ floor. i
Thanks for expediting fee installation of temporary power to fee LAN room. However the ; following items are still open and will need to be completed in the short order so feat Bell Atlantic’s portion oftiie installation is not delayed. ‘ r Provide grounding;, (schematic attached)
< Complete four of ihe six conduits running from the telephone closet near fee elevators to the LAN room. I’ve shown your electrician where the conduits are to terminate. (Two other conduits will be for WinStar and TCO and I will have those tenninationg for you shortly. . ’ i
In addition, 1 am asking that fee following items are con^ilcted in the quickest time possible to ensure cabling can begin on Qctober 19.
- Complete cable trays in LAN Room i i 5 - Complete and fire retard backboard in LAN roona
* Provide as many sleeves possible as outlined in the skecth provided by Juan Mejia of Swanks Hayden Cornell. Our preference would bd if you began the sleeves leading from the LAN roorh and then sleeves leading from the cable ti^ into the core wall on the south side of the building in each telephone closet. Sleeves into the EOC, watch e and and PIU should follow.
. Install backboard with stub outs on south and we§t walls of security room Needless to say should you have any questions or concerns regarding this matter, please contact me. Thanks Again Cc: John Hughes, OEN<[ Glenn Pyznento, DCAS
U.CWL
NYC-WTC_000173641
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000117805
Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
1 shared topics · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗Similar document embedding; no shared entity or topic indexed. · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099578
Invoice from Fiber Control Inc. for inspection services performed at multiple job sites.
Similar document embedding; no shared entity or topic indexed. · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123131
Invoice for roof asbestos abatement work completed at 196 Broadway covering over 32,000 square feet.
1 shared topics · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111531
Page listing notebook specifications including dimensions and sheet count for archival purposes.
Similar document embedding; no shared entity or topic indexed. · similarity 0.925
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127657
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
Similar document embedding; no shared entity or topic indexed. · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125755
Document with unreadable text associated with the 130 Cedar Street site.
Similar document embedding; no shared entity or topic indexed. · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108177
Single-page document containing identification codes and file references for World Trade Center environmental records at 120 Liberty Street.
1 shared topics · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112389
Invoice from an asbestos removal contractor detailing roof cleanup services performed at 45 Wall Street in September 2002.
1 shared topics · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130855
Invoice from Asbestos Removal Corp for roof cleanup services at 40 Exchange Place dated September 18, 2002.
1 shared topics · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152717
Page containing garbled text and binary data from a Department of Environmental Protection document.
1 shared topics · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000101952
A shipping order form from a Brooklyn-based company dated October 23, 2002, addressed to the Department of Environmental Protection.
1 shared topics · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Invoice from Fiber Control Inc. for cleaning a gravel roof at 2 South End Avenue totaling $59,883.10.
Similar indexed content
Similar indexed content
NYC-WTC_000099578
Invoice from Fiber Control Inc. for inspection services performed at multiple job sites.
Similar indexed content
NYC-WTC_000123131
Invoice for roof asbestos abatement work completed at 196 Broadway covering over 32,000 square feet.
Similar indexed content
NYC-WTC_000111531
Page listing notebook specifications including dimensions and sheet count for archival purposes.
Similar indexed content