Letter outlining data and telephone cable installation plan for 7

Machine-extracted title · confidence 95%

Correspondence from a technology firm detailing the routing of data and telephone cables through the 23rd floor for the Mayor's Office of Emergency Management.

NYC-WTC_000173641–000173642

Folder label: “Date and Telephone Cable Installation for OEM

Page image
Scanned page image, NYC-WTC_000173641
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DEPARTMENT OF WORMATION TECHNOLOGY [CATIONS Mr I Ddrrr aiCImmheR Sneet S«ite932 ’I jK 2 Rocms NewYoiKMYJOOW (212)7M-2330 Fix:(aU)7M-2331 t L^t<2 - October 9,1998 To: Jack Klein Ambassador Construction

From: Bob Melanifi: iL^ i >

Subject: Data and Telephone Cable Installation for QEM at 7 World Trade Center \

As you requested, attaclied is an outline of how we will be running data and te lephone cables through the 23'^ floor. i

Thanks for expediting fee installation of temporary power to fee LAN room. However the ; following items are still open and will need to be completed in the short order so feat Bell Atlantic’s portion oftiie installation is not delayed. ‘ r Provide grounding;, (schematic attached)

< Complete four of ihe six conduits running from the telephone closet near fee elevators to the LAN room. I’ve shown your electrician where the conduits are to terminate. (Two other conduits will be for WinStar and TCO and I will have those tenninationg for you shortly. . ’ i

In addition, 1 am asking that fee following items are con^ilcted in the quickest time possible to ensure cabling can begin on Qctober 19.

- Complete cable trays in LAN Room i i 5 - Complete and fire retard backboard in LAN roona

* Provide as many sleeves possible as outlined in the skecth provided by Juan Mejia of Swanks Hayden Cornell. Our preference would bd if you began the sleeves leading from the LAN roorh and then sleeves leading from the cable ti^ into the core wall on the south side of the building in each telephone closet. Sleeves into the EOC, watch e and and PIU should follow.

. Install backboard with stub outs on south and we§t walls of security room Needless to say should you have any questions or concerns regarding this matter, please contact me. Thanks Again Cc: John Hughes, OEN<[ Glenn Pyznento, DCAS

U.CWL

NYC-WTC_000173641

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173641Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →