NYC 9/11 Public Portal Document
5) Podium:
- both comer post panels are out of line, need to be rehung.
2"*^ panel to right of right comer post bottom boAving out?
6) As of 06/29/991 was advised by Niel O’Conner that no one from
Novalink arrived to complete installation of furniture comer pieces. 1 will
call Mr. Walter Lima from Novalink and discuss this issue. I will follow
up with a memo of status.
7) Mr. Walter Lima called from Novalink, apologized for the missed
appointment on 06/29/99. Requested the Mr. Greg Penny, VP
Client/Dealer Relations meet with me today 06/29/99 @11:00 hrs. I met
with Mr. Penny and discussed all the issues. Someone from Novalink will
be here Thurs / Fri to complete installation if possible, measure new pieces
if necessary and have final installation by 07/07/99. Mr. Walter Lima will
call to confirm Thurs or Fri.
C. Carpet;
1) Some minor pieces need to be refit.
2) Access panel to the right of video projector # 4 is not hung. Trim from
stairs needs to be adjusted to allow for panel to fit.
3) Opposite the podium at the two step platform, left side betv/een computer
station seat # 49 and platform, area needs to be cleaned and carpeted,
opposite side needs better carpet installation.
D. Exit signs:
1) Signs are not visible from the center of EOC
E. Fire Extinguisher signs:
1) I asked Juan if it was code to have signs for ease of locating extinguishers
from anywhere in the EOC.
F. Monitor enclosures:
1) Damage to enclosures consist of scratches to finish at following locations;
(M - monitor) M 2, 5, 10, 19, 28.
2) Scratched to turret under clock to the right of M 6.
3) Small mesh piece to the left of M 25 needs to be rehung.
Comer piece to right of M 12
3