2) Meeting with Ricky S. Janowitz on 06/29/99 at 10:00 hrs with Mazen
from /onbassador. Mr. Janowitz stated that the shades in place were the
ones specified on drawings. The shades are dual shades (both room
darkeners & solar). In addition, Mr. Janowitz stated that the material to
install the wiring was delivered to the job site. Mazen and Mr. Janowitz
went to the 13* floor to look for material. Mazen called to state that they
found some of the material for wiring. According to ambassador the
electrician did not have any instructions for wiring of shades. My question
to him, is why was all the material to do so delivered? What is
Ambassador going to do about missing material ? I will contact John
Vanderplasse from Swanke and ask him to clarify the wiring issue.
3) Closets - For both closets sprinkler heads needs to be reinstalled and
sheetrock spackle / paint finish.
Hallway
(From PIU Rm., to Responders Area)
A. Ceiling:
1) In attempt to replace damaged ceiling tiles already identified, new tiles
installed, wrong color. Approx, x 30 tiles.
B. Walls:
1) Spackle / paint support column outside of PIU Room.
C. Flooring:
1) Some minor pieces need to be refit.
D. Electrical:
1) No problems found
E. Mise:
14
NYC-WTC_000173513
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000173513Source: NYC Law Department, mirrored locally
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
8 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.999
Letter from the Division of Real Estate Service notifying the Mayor's Office of Emergency Management that final plans for 7 World Trade Center have been reviewed.
Urgent memorandum from the Mayor's Office of Emergency Management requesting completion of fiber optic press feed and A/V equipment at 7 World Trade Center.
2 shared non-person entities · Same agency, volume and box · similarity 0.928
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.