NYC 9/11 Public Portal Document
Steve Ruhr’s Office
A. Ceiling: No problems found A - E
B. Walls:
C. Flooring:
D. Electrical:
E. Mise:
Henry Jackson’s Office
A. Ceiling: No problems found A - E
B. Walls:
C. Flooring:
D. Electrical:
E. Mise:
M^Furman’s Office
A. Ceiling:
1) X 6 pieces counted as damaged or discolored due to workmanship from
various contractors. Mazen Batarseh from Ambassador Const. Co. Inc.
advised an attempt was made to clean tiles, but cleaning was unsuccessful.
Walls: No problems found B - E
C. Flooring:
D. Electrical:
E. Mise;
Jerry McCarty’s Office
A. Ceiling; No problems found A - D
B. Walls:
C. Flooring:
D. Electrical:
F. Mise;
1) One manual set of blinds damaged. Rep. from International Blind
Contractors, Ltd. measured for replacement. Awaiting installation.
Mr. Jonowitz advised material and installation should be 06/29/99.
Calvin Drayton’s Office
A. Ceiling: No problems found A - E
B. Walls:
C. Flooring:
D. Electrical:
E. Mise;
19
NYC-WTC_000171725