Steve Ruhr’s Office
A. Ceiling: No problems found A - E
B. Walls:
C. Flooring:
D. Electrical:
E. Mise:
Henry Jackson’s Office
A. Ceiling: No problems found A - E
B. Walls:
C. Flooring:
D. Electrical:
E. Mise:
Matt Furman’s Office
A. Ceiling:
1) X 6 pieces counted as damaged or discolored due to workmanship from
various contractors. Mazen Batarseh from Ambassador Const. Co. Inc.
advised an attempt was made to clean tiles, but cleaning wi.s unsuccessful.
B. Walls: No problems found B - E
C. Flooring:
D. Electrical:
E. Mise:
Jerry McCarty’s Office
A. Ceiling: No problems found A - D
B. Walls:
C. Flooring:
D. Electrical:
F. Mise:
1) One manual set of blinds damaged. Rep. from International Blind
Contractors, Ltd. measured for replacement. Awaiting installation.
Mr. Jonowitz advised material and installation should be 0(1/29/99.
Calvin Drayton’s Office
A. Ceiling: No problems found A - E
B. Walls:
C. Flooring:
D. Electrical:
E. Mise:
19
NYC-WTC_000173518
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000173518Source: NYC Law Department, mirrored locally
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
8 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.999
Letter from the Division of Real Estate Service notifying the Mayor's Office of Emergency Management that final plans for 7 World Trade Center have been reviewed.
Urgent memorandum from the Mayor's Office of Emergency Management requesting completion of fiber optic press feed and A/V equipment at 7 World Trade Center.
2 shared non-person entities · Same agency, volume and box · similarity 0.928
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.