NYC 9/11 Public Portal Document
MAR 18 ’99 11:40 PR AMBASSADOR CONSTR. C0212 949 9762 TO 6693640 P.06/06
-nw-10-193g 10:25 OFFICE OF 05^5 CY MGMT 1 212 442 099S P.06Z06
Female Bunk Room
=> Ceilingtile missing, ik>C€’
Male Bunk Room
=> Construction debris on floor.
=> Ceiling tile missing/broken.
Bathroom needs (Waning.
Deputy Pireetofs'Suiffi IMcCartv)
=> Ceiling tile missing/ T^ome-
o Needs paint touch-up.
Blinds are falling down.
Deputy Director's Office (Dravtont
Electrical plate under desk, loose. TXtAX-
Quartermaster fTalberti
: SS’XoSJJLr-.* - AUru AC ff.*-
Fire Fyfinauishcrs
=> Glass in fire extinguisher cabinets.
=> Leak Detection System installed behind hurricane wall. - M<?*J2>Ay
=> 2™* coat of waterproofing. bnonDA? - **» be Don^
2 hurricane dampers need to be re-installed. Done
=> Marlite panels (13) missing. 'Done
=> Ceiling tile missing. DOHC
Duct work needs caulking. *0006
Shades should be "blackouf not "solar". .
Cooling Towers
Hook-up chemical systems to cooling towers - both need to be done. -
Security System
UPS system for setxjrity system. - SAr/hoets -
I
=> Copies of keys tor hurricane access doors.
TOTAL P.06
TnTt^i erific rac S1Z.L-
NYC-WTC_000173499