NYC 9/11 Public Portal Document
IJ9 111 9? 1-5 5g F.».1 ; L : 2 .. 90 :5g SW.UXKE H.iYDcN CO.XNELL 0 IIII3
08/01/93 TL'E 10:42 F.\.X 212 725 0964 5HaX MILSOM & WILKE ® C02
September 1, 1998
Juan Mejia.
I Shen
Milsom
& Wilke, inc
TECHNOLDav oonsu-tamib w ih^cowmuniwtions.
AUQCVISJU. *. ACCHJKTICS
'JI fil<h A'/emic. N<w Yu.'k NV Klilki
(’li) TZJ-iJSOO I'll (lir) VU-OOM
Swanks Hayden Connell Architects
295 Lafayette Street
New York, NY 10012
Ret: Exhibix “A"
DearJUMi:
As tequested, this is ±.e equipment deletion distribution for the value engiueexing package.
I. RF Dutabuuca System
A. (74) 'j-Turtcen (13”> monitors were deducted previously by Ace Audiovisual, as the
result of a direct request hem Ambassador Construction. They were therefore not
part of die value engineering package issued by SMW on July 24,1998.
Deduct 25,382.
II. Press Feeds
A. The manuficturer’s quote for fiber equipment has been down-graded, reducing the
number of feeds betwaen the Peets Room and the sneer.
D«du« 116,027.
B Audio distribution amplifiers for distribution to mulc^le box (ocaaons am no longer
tcquiired, and arc part of Che value engineemg package.
Deduct 1,747.
C. Video cable between the EOC and the Press Room was deducted nrcviously by Ace
Audiovisual, as the result of a direct request from Ambassador Coosixuetion.
Deduct 5,500.
ni. External Video Feeds
A. The Pesa video matrix switch for switching and distnbuden to inuidplc modulators
is no longer required, and is part of the value engineering package.
Deduct 92,719.
8. The manufacturer's quote for head-end equipment has been revised, reducing the
number of modulated and re-modulated channels avaiUble for general disttibadon.
Deduct 39,529.
N I' w V o a :< • A > I. I M f i- o N , D c I 1. (J i» I 1'1 .> • CiliCAGd • HOVft KONC • KU A I. A Lb.UH UK
NYC-WTC_000173442
OCR can misread numbers and units. Confirm readings against the page image before using them.