Letter transmitting governing issues concerning electricity for the Mayor's Office of Emergency Management and noting tapping fee requirements.

NYC-WTC_000173242–000173243

Folder label: “7 World Trade Center - MOEM Tapping Fee for Additional Electrical Requirements

Page image
Scanned page image, NYC-WTC_000173242
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Silverstein Properties. Inc. 7 World Trade Center New York, NY 10048 Telephone 212-619-6569 Fax 212-732-5190

June 12, 1998

Mr. Richard Ramos Executive Director of Space Design Department of City Wide Administrative Services 1 Centre Street, Room 20-02 South New York, New York 10007

RE: 7 World Trade Center - MOEM Tapping Fee for Additional Electrical Requirements

Dear Mr. Ramos:

Attached is the Lease Article that governs the issues concerning the electricity for OEM at 7 World Trade Center.

Also, attached is a copy of the plan review letter dated (4/23/98) to Mr. Joseph Aliotta of Swanke Hayden Connell Architects indicating any additional electrical requirements is subject to a tapping fee.

Landlord is obligated to provide only six (6) watts per rentable squre foot for lighting and power (excluding power to service base building air conditioning). The electrical requirements by OEM has exceeded the Lease Allowance. Therefore, the overage is subject to a tapping fee. To determine the amount of the tapping fee, a load analysis was performed by Consentini Associates, (attached).

a. The allowable electrical connected load, in accordance with the OEM lease, is 6 Watts per square foot.

Therefore:

6 Watts per square foot X50,182 rentable square feet = 301092 Watts or 376 Amps at 277/480 Volts.

b. The electrical load breakdown for OEM per Consentini Associates is 1,180 KW (connected load) or 1,475 Amps at 277/480 Volts.

NYC-WTC_000173242

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173242Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order submission memo, Nov 1999 · Box 7DCAS

NYC-WTC_000168367

Letter submitting change order #104 for galvanized riser and fiber optic cable installation for telephone and camera systems at 7 World Trade Center.

1 shared non-person entities · Same agency, volume and box · similarity 0.873

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168645 · Box 7DCAS

Revised Change Order #16 submitted for electrical work at 7 World Trade Center dated October 19, 1998.