NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #004 REVISED Am;Uob#Si7;5115
Document / 3 pages

Revised change order #004, 7 World Trade Center, September 1998

Machine-extracted title · confidence 95%

Revised change order from Ambassador Construction Co. Inc. for concrete work and panel capacity changes at the Mayor's Office of Emergency Management.

NYC-WTC_000173175–000173177

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #004 REVISED Am;Uob#Si7;5115

Page image
Scanned page image, NYC-WTC_000173177
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AMBASSADOR CONSTRUCTION CO, INC.

Mr. Walter Weems September 11,1998

Page Three...

14. Hurricane damper ductwork with grill, at (32) locations. $26,356.00^

15. Hurricane damper ductwork at (32) locations above wall. $58,487.00 Z

16. 88 Ruskin Model #CD80AAF4 Hurricane dampers with 45" W.G. static pressure. $61,560.00 < / "lx. Ji’*; v 17. 32 Architectural 10x10 grills. $4,560,00,al , l-

18. Vaivcon electric (2) position, 120 volt industrial actuator for Hurricane dampers in duct work. Z $35,150.00

19. Credit original amount in budget for hurricane wall. CSCIOQCLQQ^ Subtotal $253,934:06 General Conditions 20,315.00 Overhead & Fee 16,455.00 Insurance X634.0O Total Cost $294,338.00

Alternate: To furnish and install Motorized dampers in Hurricane wall HVAC $49,500.00 Electric 61,987.00 Subtotal $111,487.00 General Conditions 8,919.00 Overhead & Fee 7,224.00 Insurance 159SJQQ Total Cost $129,225.00

Please send us your formal change order so this work may proceed.

Very truly yours, , / /

meider Vice President ) MS:ag cc: Glenn Pymento

Accepted: Dated: c:\wpd ocs\oem[oemco4.wpcll

NYC-WTC_000173177

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173177Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #004, 7 WTC, Sep 1998 · Box 7DCAS

NYC-WTC_000172050

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.997

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004, Sept 1998 · Box 7DCAS

NYC-WTC_000173309

Letter from Ambassador Construction submitting a revised change order for work at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.993

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004 for OEM, September 1998 · Box 7DCAS

NYC-WTC_000173810

Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.980

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173458 · Box 7DCAS

Letter submitting a revised Change Order #004 for concrete and electrical work at 7 World Trade Center.

Similar indexed content

NYC-WTC_000173271 · Box 7DCAS

A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.

Similar indexed content

NYC-WTC_000173274 · Box 7DCAS

A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.

Similar indexed content

NYC-WTC_000172050 · Box 7DCAS

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

Similar indexed content

NYC-WTC_000173309 · Box 7DCAS

Letter from Ambassador Construction submitting a revised change order for work at 7 World Trade Center.

Similar indexed content

Compare copies and versions →