machine-extracted · confidence unavailable · Check page ↗Unit price schedule for security equipment, 1993
Machine-extracted title · confidence 85%Price schedule listing unit costs for installing relay boxes, switches, conduit, and various security system components.
NYC-WTC_000173161Folder label: “Mayor's Office of Emergency Management®7 World Trade Center®Entire 23rd & Portion 7th Floors”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
JUN-lG-ae 11=07 FROM=SILVERSTEIN PROPERTIES 10=2127321207 PAGE 2/2
Silverstein Properties, Inc. I S21 Fifth Avenue BSOBEiRiTilES; New York, New York 1O175 Telephone; 212 490-0666 120 Broadway New York, New York 10271 Tetephonc: 212-732-8700 VIA FACSEni JE-.669^26^ Fax- 212-732-1207 Caiherine T. Giliberti Senior Vice President June 16, 1998
Mr. Richard J. Ramos Executive Director of Spate Design/DRES The City of New York Department of Citywide dnistrative Service '.Til Hill?
Division of Real Estate Service Muncipal Building, Room 2053S New York. NY 10007
Re: Mayor’s Office of Emergency Management 7 World Trade Center Entire 23rd & Poition 7th Floors________
Dear Richard;
As you requested, please be advised that the cost of the spare fuel oil lines OEM would be permitted to use is $302,410.00.
Please advise if you need additional information.
Cordially,
Catherine T. Giliberti \ \
cc; Chi Chu, SPI Jeffirey Kondrat, GS A Walter Weems, SPI
/psb oem.3
NYC-WTC_000173161
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000172127
Contractor notifies of a $34,475 increase to the proposal due to revised quotes from visual trade contractors.
3 shared non-person entities · Same agency, volume and box · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173998
Submission of Change Order #55 for $34,954 addressing fuel oil line installation issues.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168384
Letter submitting change order #97 for enclosing fuel oil lines with sheetrock assembly at the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168402
Letter submitting change order #89 for $7,553 to install power and control wiring for the Inergen system in the fuel oil tank room.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.904
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168692
Contractor submission of Change Order #003 for plug mold outlet and A/V work at the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171341
Cover letter submitting Change Order #97 for enclosing oil lines with rated sheetrock assembly at the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167740
Cover letter transmitting a memo regarding the design status of the Mayor's Office of Emergency Management at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172570
Certified letter demanding $2,000,000 in payment for the Mayor's Office of Emergency Management project at 7 World Trade Center before further change orders are processed.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168407
Letter submitting change order #88 for $120,957 to install an eight-inch conduit for fuel oil piping at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172194
Contractor submission of change order for power and control wiring at the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
NYC-WTC_000172127
Contractor notifies of a $34,475 increase to the proposal due to revised quotes from visual trade contractors.
Similar indexed content
Submission of Change Order #55 for $34,954 addressing fuel oil line installation issues.
Similar indexed content
Letter submitting change order #97 for enclosing fuel oil lines with sheetrock assembly at the Mayor's Office of Emergency Management.
Similar indexed content
NYC-WTC_000168402
Letter submitting change order #89 for $7,553 to install power and control wiring for the Inergen system in the fuel oil tank room.