Unit price schedule for security equipment, 1993

Machine-extracted title · confidence 85%

Price schedule listing unit costs for installing relay boxes, switches, conduit, and various security system components.

NYC-WTC_000173161

Folder label: “Mayor's Office of Emergency Management®7 World Trade Center®Entire 23rd & Portion 7th Floors

Page image
Scanned page image, NYC-WTC_000173161
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

JUN-lG-ae 11=07 FROM=SILVERSTEIN PROPERTIES 10=2127321207 PAGE 2/2

Silverstein Properties, Inc. I S21 Fifth Avenue BSOBEiRiTilES; New York, New York 1O175 Telephone; 212 490-0666 120 Broadway New York, New York 10271 Tetephonc: 212-732-8700 VIA FACSEni JE-.669^26^ Fax- 212-732-1207 Caiherine T. Giliberti Senior Vice President June 16, 1998

Mr. Richard J. Ramos Executive Director of Spate Design/DRES The City of New York Department of Citywide dnistrative Service '.Til Hill?

Division of Real Estate Service Muncipal Building, Room 2053S New York. NY 10007

Re: Mayor’s Office of Emergency Management 7 World Trade Center Entire 23rd & Poition 7th Floors________

Dear Richard;

As you requested, please be advised that the cost of the spare fuel oil lines OEM would be permitted to use is $302,410.00.

Please advise if you need additional information.

Cordially,

Catherine T. Giliberti \ \

cc; Chi Chu, SPI Jeffirey Kondrat, GS A Walter Weems, SPI

/psb oem.3

NYC-WTC_000173161

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173161Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #89 submission, 7 WTC, June 1999 · Box 7DCAS

NYC-WTC_000168402

Letter submitting change order #89 for $7,553 to install power and control wiring for the Inergen system in the fuel oil tank room.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.908

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168384 · Box 7DCAS

Letter submitting change order #97 for enclosing fuel oil lines with sheetrock assembly at the Mayor's Office of Emergency Management.