NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/MOEM 7 WTC Breakdown of approved Change Orders
Document / 3 pages

Breakdown of approved work costs, MOEM, July 1999

Machine-extracted title · confidence 50%

Document dated July 12, 1999 listing approved change orders and costs for construction work at the Mayor's Office of Emergency Management in 7 World Trade Center.

NYC-WTC_000172947–000172949

Folder label: “MOEM 7 WTC Breakdown of approved Change Orders

Page image
Scanned page image, NYC-WTC_000172948
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

37 F&l stainless steel cladding to 20 existing window mullions 40166 $0.00 VOID $0.00 38 Additional drains as per SKP 3 and SKP 4 in HC toilet rooms 23-3 & 23-32 $8,346.00 1/25/99 $7,066.00 Approved $7,000.00 39R Mobile PBF 15'W X 17 3/4" D LN Novalink furniture not included in base bid_______ $26,391.00 12/29/98 $26,391.00 Approved $26,391.00 40 Chop concrete and weld new rebar to existing rebar in trench w/3" overlap $26,427.00 1725/99 $21,366.60 Approved $21,300.00 41 Antenna support per revised sketch from Cantor adding 4 steel clips welded to web $16,807.00 1/25/99 $14,50O.OO Approved $14,500.00 42 F&l 4 type G wall washers in room #23-40 as per FSK-51 5505 $0.00 VOID $0.00 43 RG-6LI plenum cable for Time & Warner TV as per John Hughes letter $11,759.00 1/25/99 $11,006.00 Approved $11,000.00 44R F&l oil piping as per revised routing sketch FSK50 & SK58 dated 3/19/99 $85,893.00 4/8/99 $85,000.00 Approved $85,000.00 45 F&l 1 custom press panel & installation & termination of cables in to it $1,430.00 12/29/98 $1,436.00 Approved $1,430.00 46 Additional electrical work in room 23-50 and 23-18 for power supply/security equip 2168 $0.00 VOID $0.00 47 Furnish 3 stainless steel flexes for the generators $3,941.00 1/4/99 $3,941.00 Approved $3,941.00 48 Additional work as per Swanke memo dated12/29/98__________________________ $4,679.00 1/25/99 $4,679.00 Approved $4,679 00 49 Change ceiling tile & sprinklers in press room $6,779.00 3/11/99 $6779.60 Approved $6,779.00 50 Correct incompatibility between Ace video equip & Lutron dimming system $1,067.00 1755759 $1,067.00 Approved $1,067.00 51 Various changes in storage room shelving units ^75700 1755755 $751.00 Approved $751.00 52 Various electrical changes as per RB Samuel's work orders $38,987.00 3/11/99 $36,000.00 Approved $36,000.00 53 Various electrical changes as per RB Samuel's work orders $2,898.00 3/11/99 $2,898.00 Approved $2,898.00 54 Man hour cost for moving computer equipments on 23rd floor $2 671.00 3/11/99 $2,671.00 Approved $2,671.00 55 Removal /reinstallation of electrical work due to new routing of fuel line $34,954.00 3/11/99 $29,000.00 Approved $29,000 00 56 1 duplex outlet on 1 st floor with cable in 1" conduit 10545 $6.66 VOID $0.00 57 Additional equipment & labour for security work as per SHCA memo dated 12/17/98 $68,613.00 3/11/99 $63,000.00 Approved $63,000.00 58 Labor for moving computer equipments $5,506.00 3/11/99 $5,506.00 Approved $5,506.00 59 1 duplex outlet on 1st floor w/wiring through existing 4" conduit $10,948.00 3/11/99 $10,948.00 Approved $10,948.00 60 Close gap at steel in hurricane wall w/16 gauge steel plate as per FSK-54 $8114.00 3/11/99 $8114.00 Approved $8,114.00 61 Mag lock over ride button for doors at toilet rooms, water storage room,bunker rooms and door leading to bunker room area $2,785.00i 3/11/99 $2,400.00 Approved $2,400.00; 62 Roof repair as per details at new curb from Kemper system $9,679.00 3/11/99^ $9,679.00 Approved $9,679.00 63 Additional electrical work as per RB Samuels work orders $1,912.00 3/11/99 $1,915.60 Approved $1,912.00 64 Additional electrical work as per RB Samuels work orders $7114.00 3/11/99 $6,500.00 Approved $6,500.00 65 x-ray machine and bagging system $26,336.00 2/10/99 $22,721.00 Approved $22,721.00 66 Press room floor and podium $15,460.00 3/11/99 $14,800.00 Approved $14,800.00 67 Various electrical changes as per RB Samuel's wcrk orders $2,894.00 3/11/99 $2,894.00 Approved $2,894.00 68 F&l astragal on door #5 ACME pair of doors 406 $0.00 VOID $0.00 69 F&l closer, roof chain and provide additional keys $780.00 3/11/99 $675.OO Approved $672.00 70 Three (3) 28" dia. And Two (2) 21" dia. Cast magnum plaques__________________ $6,114.00 3/11/99 $6,114.00 Approved $6,114.00 71 3 phase 30 amp wiring for circulating pumps $4,579.00 3/1-(/99 $4,579.00 Approved $4,579.00 72 F&l Two (2) Alto Shaam cooking and holding oven model 1000-THI/HD/D 11539 $0 00 VOID $0.00 73 Furnish two (2) Luxor TVP44 -44" TV cart for PIU room monitors $1,580.00 $0.06 Not io be approved $1,580.00 74 F&l blackout shade bands for press room & Mayor's conference room $<63700 $0.00 Not to be approved $4,631.00 75 F&l (2) two UPS units $4,874.00 3/25/99 $4,874.00 Approved $4,874.00 76 Relocate existing cold water make-up line as requested by Building Engineers $701.00 to be approved $701.00 A&E fee for additional Audio-visual scope of work 18500 $0.00 VOID $0 00 77 Dam closure, flashing and Aluminum drip pan at radio room on the roof $24,274.00 being revised being revised $24,274.00 78 Various work by RB Samuels/Precision Interiors/Milier Druck $7,710.00 to be approved $7,710.00 79 F&l one hundred additional reinforcing plates for the blast proof & access doors $6,955.00 letter from SHC to be reviewed $6,955.00 80 Removal of additional granite flooring regarding fuel oil pipe work $1,631.00 $0.00 Not o be approved $1,631.00 81 Fasten radio room walls to the structural steel with special clips $8,228.00 HOLD HOLD $8,228.00 82 Replace door & frame of radio room with blast resistant door $8,313.00 HSED HOLD $8,313.00 83 Modify duct conflicting with light in EOC room $2,805^ to be approved $2,805.00 84 Credit tor deleted 8 monitors and addition to reinstall cove light in EOC room -$30,681.00 to be approved -$30,681.00 85 Additional cost for revised fuel line addition to CO44R 34401 $0:00 VOID $0.00 86 Reroute new exhaust duct around the existing stee beam $0.00 VOID $0.00 87 UPS conversion kit not received 88 Revised cost for fuel oil piping through 2nd floor machine room corridor $135,957.00 7ni99 $130,000.00, Approved $130,000.00 89 Control wiring for Intergen System in fuel tank room _________________________ $7,553.00 letter from engr. $7,553.00 Credit amount for previously approved fuel oil line ~[ Approved

Total $1,013,372.00 $820,877.00 $864,577.00

NYC-WTC_000172948

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172948Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Breakdown of approved construction costs, April 2002 · Box 7DCAS

NYC-WTC_000171286

Document dated April 12, 2002 listing approved costs for various construction items including wall relocation and hurricane wall work at the Mayor's Office of Emergency Management.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗
MOEM approved work breakdown, June 1999 · Box 7DCAS

NYC-WTC_000172970

Document listing approved costs for ductwork, electrical changes, and hurricane wall construction at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.963

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173550

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957

machine-extracted · confidence unavailable · Check page ↗
OEM budget breakdown for 7 WTC project, November 1998 · Box 7DCAS

NYC-WTC_000173554

Budget accounting document detailing construction costs, revised budgets, and change order approvals for the Mayor's Office of Emergency Management at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.953

machine-extracted · confidence unavailable · Check page ↗
OEM breakdown of approved change orders, Nov 1998 · Box 7DCAS

NYC-WTC_000173552

Itemized list of approved change orders for the Mayor's Office of Emergency Management at 7 World Trade Center, including costs and approval dates.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →