NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/The Mayors Office of Emergency Management Command EOC Work Stations (LaCOUR Proposal No. P2353B)
Document / 7 pages

EOC workstation proposal with monitor platforms, LaCour Inc., May 1998

Machine-extracted title · confidence 50%

Proposal from LaCour Inc. dated May 18, 1998 for EOC workstations including monitor platforms and lighting fixtures for the Mayor's Office of Emergency Management.

NYC-WTC_000172870–000172876

Folder label: “The Mayors Office of Emergency Management Command EOC Work Stations (LaCOUR Proposal No. P2353B)

Page image
Scanned page image, NYC-WTC_000172874
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

LACOUR 20 Elm Street, Harrington Park, NJ 07640 ■ (201) 784-3240 ■ Fax: (201) 784-1764

TO: AMBASSADOR CONSTRUCTION

317 MADISON AVENUE, SUITE 1200 NEW YORK, NEW YORK 1017

ATTN: JACK KLEIN The METTWERKS Station SALES QUOTATION PROPOSAL NUMBER: P2353B DATE: 5/18/98 TITLE: MAYOR'S OFFICE OF EMERGENCY MANAGEMENT EOC WORK STATIONS REFERENCE: SWANKE HAYDEN & CONNELL ARCHITECTS DRWG. No. D/1 DATED 4/6/98 PAGE: ONE OF FOUR DESCRIPTION: QTY NET SALE PRICE: WORK STATION FOOT PRINT 60"L X 47"D 60"L X 16"D WORK TOP W/ URETHANE BUMPER EDGE: 74 $15,522.24 SPANNER SLATWALL ASSEMBLY: 20 $13,110.00 UNILATERAL SLATWALL ASSEMBLY: 34 $15,288.88 CPU STANCHION MEMBER (2 PER. STATION): 74 $19,402.80 VARIABLE SPANNER STRUT ASSEMBLY: 20 $6,135.48 VARIABLE UNILATERAL STRUT ASSEMBLY: 34 $5,655.55 STANCHION HEADER CROSS MEMBER: 74 $7,430.30 CANTILEVER SUPPORT VERTICAL: 116 $22,811.40 FULL EXTENSION CPU TRAY: 74 $7,653.43 SPECIAL FILLERS & ACCESSORIES: 15- MONITOR BEZEL: 16 ir MONITOR BEZEL: 13 21” MONITOR BEZEL: 62 LITTLITE UL 3/18 WITH WEIGHTED BASE & BULB: 74 BINDER STORAGE INSERT: 61 HINGED, PERF. METAL MONITOR COWLING: 74 SPANNER COWLING SPLINE: 20 UNILATERAL COWLING SPLINE: 34 MONITOR COWLING BUTTRESS MEMBER: 148 15’ARTICULATING MONITOR PLATFORM: 16 17’ARTICULATING MONITOR PLATFORM: 60 21’ARTICULATING MONITOR PLATFORM: 77 22’ARTICULATING MONITOR PLATFORM: 58 24’ARTICULATING MONITOR PLATFORM: 227 16 BOTTOM EQUIPMENT BAY FILLER: 222 PREMIUM GRADE BOX, BOX, FILE MOBILE DRAWER PEDESTAL W/ GANG LOC ‘ 74 CONTINUOUS D'MARC PANEL FOR CLEAN & UPS POWER STRIP: 74 ALL ELECTRICAL FIXTURES SUPPLIED BY LOCAL 3 CONTRACTOR: CABLE MANAGERS & WIRE DUCT SET:_____________________________ 74 SUBTOTAL DESK ACCESSORIES: 1173 $147,999.32

TOTAL FULLY OPTIONED WORK STATIONS: 1693 $261,009.41

END & BACK PANELS: PLASTIC LAMINATE SPANNER END PANEL: 8 $3,647.70 PLASTIC LAMINATE UNILATERAL BACK PANEL: 6 $0.00 PLASTIC LAMINATE UNILATERAL END PANEL: 12 $4,290.00 PODIUM, CENTER SPLINE & WORK TOP FILLERS: CENTER PODIUM ASSEMBLY: 1 V SHAPED UNILATERAL SLATWALL FILLER WITH TOP SECTION: 18 Y SHAPED SPANNER SLATWALL FILLER WITH 2 TOP SECTIONS: 8 PLASTIC LAMINATE UNILATERAL END PANEL: 27 $33,432.75

SUB TOTAL PODIUM, FILLERS, END & BACK PANELS: S3 $7,937.70

CORPORATE FURNISHING SYSTEMS ■ DESIGN ■ ENGINEERING CONSULTANTS

NYC-WTC_000172874

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172874Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

1 shared non-person entities · Same agency, volume and box · similarity 0.918

machine-extracted · confidence unavailable · Check page ↗
HVAC revised quotation fax, June 1998 · Box 7DCAS

NYC-WTC_000172331

Fax from P.J. Air Conditioning Contractors submitting a revised price quote for HVAC work at the Mayor's Office of Emergency Management.

1 shared non-person entities · Same agency, volume and box · similarity 0.913

machine-extracted · confidence unavailable · Check page ↗
Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172054

Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

3 shared non-person entities · Same agency, volume and box · similarity 0.912

machine-extracted · confidence unavailable · Check page ↗
RFI and fax log records, 1995 · Box 7DCAS

NYC-WTC_000166730

Log entries recording received faxes and requests for information related to the 7 World Trade Center project in 1995.

1 shared non-person entities · Same agency, volume and box · similarity 0.912

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

Similar indexed content

Compare copies and versions →