Computer flooring proposal for 7 WTC, May 1998

Machine-extracted title · confidence 95%

Proposal from Computer Floors Inc. dated May 27, 1998 to supply materials and labor for computer flooring at the World Trade Center.

NYC-WTC_000172831

Folder label: “Mayor's Office of Emergency Management®7 World Trade Center - 23rd Floor®New York, New York

Page image
Scanned page image, NYC-WTC_000172831
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document 4^

W 11:27AM COMF^UTER FLOORS INC. P.2/2

COMPUTER HnTiRg. TNC. (973) 340-3666 (212) 564-4998

19 RICHMOND STREET Fax: (973)340-1565 CLIFTON. NEW JERSEY 07011

May 27,1998 AmbassadoriConstruction Co., Inc. 317 Madison Avenue New York, New York 10017 ATTN; Jack Klein Revised Price Re: Mayor’s Office of Emergency Management 7 World Trade Center-23’’'’ Floor New York, New' York ' We hereby propose to supply material, labor, and equipment for the installation of computer flooring at the above-named job location. The price for this will be $92,300.00.

: Included in die above price; 1. Supply 10,230 S/F of new Interface AR/C-Tec Tec-Crete II bare computer' floor panels with rigid grid system mderstructure for 4”-32” finished floor heights. $65,988.00 2. Supply 756 S/F of new Interface ,A VC-Tec Tec-Crete II computer floor panels with vinyl composite tile su face with rigid grid system understructure for an 8” finished fl lor height. $6,641.00 3. Supply 3 panel lifters. Included 4. Supply 4 steps with 2 risers each. 5. Supply 2 steps with 3 risers each. $4,098.00 6. Supply 141 S/F of ranp. $3,243.00 7 Supply 35 L/F of standard anodize; aluminum floor mounted handrail. $2,980.00 8. Supply 50 L/F of standard anodized aluminum wall mounted handrail. $1,700.00 9. Supply 144 L/F of fascia. $2,880.00 10. Cut and trim 85 cable cutouts. $2,295.00 11. Cut and support for 202 L/F of partition to slab $2,475.00 12. Delivery of material ~ based on the use of an elevator. Included 13. Complete installation. Included 14. Tax Exempt Certificate to be provided. Not included in the above price: 1. Carpet; vinyl base; perforated pane' s; attic stock; vacuuming; grounding; electrical , equipment; cleaning; protection; re )lacement of material damaged by others. 2. 8 New York City Sales Tax. 3. All additional labor and material w 11 be at standard unit prices. NOTE; The above price will be in effect f >r the next 60 days. Respectfully submitted, COMPUTER FLOORS, INC.'

TS/tcs Tor Sundlin -<^9 NYC-WTC_000172831

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172831Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171455 · Box 7DCAS

Ambassador Construction letter dated February 1, 1999, submitting Change Order #66 for $15,460 to install floor boxes and relocate wiring at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168493 · Box 7DCAS

Memo submitting Change Order #66 for $15,460 to install floor boxes and relocate wiring at 7 World Trade Center.