Same agency, volume and box · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗OEM, 7WTC
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000172670
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
, 1993 IbIS FR R.B.SAMUbS^ ^212 213 4089 TO RMBRSSAEOR P.01/05
ROBERT B. SAMUELS INC. S/eoitioai Ga/iiiaaiiid TO: COMPANY NAME: ATTENTION OF:
FAX:
FROM: FAX #: (212) 213-4089
TOTAL NUMBER OP PAGES INCLUDING COVER SHEET: 5
DATE: REFERENCE:
352 PARJ: avenue SOUTH/NEW YORK 10010/686-6700/FAS; 213-4089 NYC-WTC_000172670
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000172501
Addendum #1 to a construction cost estimate for the Mayor's Office of Emergency Management space at the World Trade Center.
Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗Same agency, volume and box · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172473
Addendum #1 to a construction cost estimate regarding electric fixtures for the Mayor's Office at the World Trade Center.
Same agency, volume and box · similarity 0.916
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171490
Faxed estimate or work proposal from construction contractor regarding unspecified work at 7 World Trade Center with pricing and scope details.
Same agency, volume and box · similarity 0.912
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171295
Contractor proposal to modify fusible link on tank room hatch for automatic closure upon activation.
Same agency, volume and box · similarity 0.897
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173419
Correspondence from ACE Audiovisual explaining price reductions for monitor elimination and clarifying switching device requirements.
Same agency, volume and box · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173144
A letter from ACE Audiovisual explaining price reductions for the removal of monitors at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.884
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173027
ACE Audiovisual explains price reductions for eliminating monitors while retaining necessary switching devices.
Same agency, volume and box · similarity 0.883
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.883
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000098030
Fax cover sheet from Franc-Men Realty Co. transmitting asbestos test results for 124 Nassau Street to the DEP.
Similar document embedding; no shared entity or topic indexed. · similarity 0.882
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
NYC-WTC_000173108
Letter from DCAS forwarding a construction cost estimate for the Mayor's Office of Emergency Management to the Office of Management and Budget.
Filed in the same folder
NYC-WTC_000172501
Addendum #1 to a construction cost estimate for the Mayor's Office of Emergency Management space at the World Trade Center.
Similar indexed content
Similar indexed content
Similar indexed content