NYC 9/11 Public Portal Document
'13 ,11; 3} , I-5 sa F i.t ;: 22 X/i;; ' > 5*.t.\XE a.vYOE.'. CONNELL 42 ‘111 J
08- 01/83 TUE 10:42 F.\.l 212 723 0904 3HE.V MILSOM 4 »ILKE ®co:
Septembet 1. 1998
Juan Mejia.
S-ivanke Hayden Connell Architects
I Shen
Milsom
& Wilke .nc
TKHNOLOOr 0ONSU.TAMIS m TafOOMMUNIC/lTiONS.
Auocvistju. a ACOurncs
«|7 filth Aoeniic, N<vi Yo.-i NV Kliir.
(212) 72J-4iW Fu (2!:) 7U-.'yiM
295 Lafavetw Street
x\'w York, NY 10012
Ret; Exhibit "A’*
Dcarjuan:
As requested, this is the equipmenc deletion disteibudon for the value cagiuccdng package.
r. RF Dutobutica System
A. f74) ’fhirteen (13”, monitors were deducted previously by Ace Audiovisual, as the
result of a direct request &om Ambassador Construction. They were thcrcfocc not
part of ±e value engineering package issued by SMW on July 24,1998.
Deduct 25,382.
n. Pims Feeds
A. The manufacturer’s ouote for fiber equipment hat been down-graded, reducing the
number al feeds beewstn the Peets Room and rhe street. I
- Deduct 116,027.
B Audio distribution amplifiers for distziburion to mult^le box locarioos are no longti
required, and arc part of the value engineering package.
Deduct 1,747.
C. Video cable between the EOC and the Press Room was deducted orcviously by Ace
Audiovisual, as the result of a direct request from Ambassador Coostxucuon.
Deduct 5,S00.
m. External Video Feeds
A. The Pcsa video matrix switch for fwicching and dismbucen to tnuitiple modulators
is no longer required, and is part of the value engineering package.
Deduct 92,719..,
B. The miaufflcoucr’s quote for head-end equipment has been revised, reducing the
number of modulated and re-tnodulated channels available for general distribarion.
Deduct 39,529.
H I' W V O t •« « W » I , I IM C O N .'3 c >. O It I I I C i C-»;(l • H n V rt KONG • KU A I. A I. u.'lKija
NYC-WTC_000172095
OCR can misread numbers and units. Confirm readings against the page image before using them.