HVAC construction estimate, 7 World Trade Center, Sept 1990 · Box 7DCASNYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
1 shared non-person entities · Same agency, volume and box · similarity 0.924
HVAC exclusion notice fax, June 1998 · Box 7DCASNYC-WTC_000172329
Fax from KABACK listing excluded costs such as cutting, patching, and fireproofing for HVAC work at the site.
1 shared topics · Same agency, volume and box · similarity 0.923
HVAC cost exclusions notice, June 1998 · Box 7DCASNYC-WTC_000172598
Letter from HVAC contractor listing excluded costs such as cutting, patching, and fireproofing for a project at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.922
Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCASNYC-WTC_000172054
Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.
Same agency, volume and box · similarity 0.919
Letter regarding OEM Bulletin #1 sheetmetal work, Aug 24 1998 · Box 7DCASNYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
Same agency, volume and box · similarity 0.909
Change order #004 systems installation, 7 WTC, Aug 1998 · Box 7DCASNYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
Same agency, volume and box · similarity 0.901
HVAC cost breakdown fax, June 1998 · Box 7DCASNYC-WTC_000172328
Fax from KABACK detailing cost adjustments for HVAC controls and dampers at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.900
HVAC construction cost breakdown, 7 World Trade Center, June 1998 · Box 7DCASNYC-WTC_000172597
Itemized cost breakdown for HVAC work including controls, economizer coils, dampers, insulation, ductwork, and piping totaling $104,676, dated June 9, 1998.
Same agency, volume and box · similarity 0.895
Letter regarding Change Order #004, August 1998 · Box 7DCASNYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
Same agency, volume and box · similarity 0.894
Revised HVAC proposal from Kaback Enterprises, February 1999 · Box 7DCASNYC-WTC_000172958
Letter dated February 11, 1999 from Kaback Enterprises submitting a revised HVAC proposal for the Mayor's Office of Emergency Management at 7 World Trade Center.