NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #030 Amb. Job # S57-5175
Document / 1 page

Change Order #030 for concrete pad and drilling, Nov 1998

Machine-extracted title · confidence 95%

Ambassador Construction change order #030 detailing costs for a concrete pad, drilling, and oil leak detection basin.

NYC-WTC_000171934

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #030 Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000171934
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NOU 18 ’98.11:38 PR AMBASSADOR CONSTR. €9212 949 9762 TO 6693640 P.02/20

AMBASSADOR CONSTRUCTION CO., INC.

0 Mr, Walter Weems Silverstein Properties, Inc. November 17,1998

7 World Trade Center New York, NY 10048 RE; Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23rd Floors Change Order #030 Amb. Jab.#S5Z-Sl75 Dear Mr. Weems: We are pleased to submit herewith our change order #030 to perform the following work at the above referenced premises for the sum of ONE THOUSAND THREE HUNDRED NINETY ONE DOLLARS ($1,391.00): As per sketch FSK-47 for new 8" concrete pad for UPS. $750.00 As per sketch from the Cantor Seinuk Group, drill #4 bars into existing roof slab on both sides of new beams. $2^800.00 As per sketch FSK-41 for oil leak detection basin @ 1st Floor: - Credit for catch basin <$$,300.00> - Add for steel ..... 950.00 Subtotal $1,200.00 General Conditions 96.00 Overhead and Fee 78.00 Insupmce, .. JIJJQQ / Total^redit $1,391.00 Please send us your approval for this work, part of it has been started, t Please sign one (1) copy of this letter and return it to our office for our records. We trust the above meets with your approval and we look forward to the continued pleasure of serving you. If you have any questions, please do not hesitate to contact us. Very truly yours, AMBASSADOR CONyRUC^ON CO., INC.

Martin Schneider Vice President MS,am cc; Juan Mejia - SHC Glenn Pymento - DCAS Accepted Dated WlWOATittOeMCO.WPC'

317 MADISON avenue. NEW YORK, NY 10017. 212 922 1020, FAX 212 949 9762

NYC-WTC_000171934

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171934Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #70 submission for plaques, Feb 1999 · Box 7DCAS

NYC-WTC_000171643

Ambassador Construction submits Change Order #70 to install three 28-inch and two 21-inch cast magnum plaques at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168595 · Box 7DCAS

Submission of Change Order #30 for a new UPS concrete pad and drilling into roof slabs at 7 World Trade Center.

Similar indexed content

NYC-WTC_000173866 · Box 7DCAS

Ambassador Construction submits Change Order #30 for an 8-inch concrete pad for UPS equipment and drilling into the roof slab at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168552 · Box 7DCAS

Memo submitting Change Order #49 to provide ceiling tiles and relocate sprinkler heads in the press room.

Similar indexed content

NYC-WTC_000168464 · Box 7DCAS

Submission of Change Order #75 for $4,874 to furnish and install two UPS units at 7 World Trade Center.

Similar indexed content

Compare copies and versions →