NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #078 Amb. Job # S57-5175
Document / 1 page

Change order #078 for speaker work, 7 WTC, Apr 1999

Machine-extracted title · confidence 95%

Ambassador Construction submits Change Order #078 to remove and reinstall speakers and fire devices at 7 World Trade Center.

NYC-WTC_000171658

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #078 Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000171658
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

fiPR 08 1989 ,15:34 PR ONBASSADOR CON. TO 7325190 P.02/08

AMBASSADOR CONSTRUCTION CO., INC.

April 8, 1999 Mr, Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York, NY 10048

RE: Mayor's Office of Emergency Management 7 World Trade Center -1,7 & 23rd Floors Change Order #078 Amb.jQhJStS57-5175

Dear Mr. Weems:

We are pleased to submit herewith our change order #078 to perform the following work at the above referenced premises for the sum of-SIK THOUSAND SIX HUNDRED TWeNTY-WNE DOLLARS (iSreerOOJ: /Vjew SCOPE OF WORK - Remove and reinstall speakers and fire devices for installation of ceiling tiles in the press room. See R.B. Samuels field order #28516 (attached). $1,245.00 L - Refeed electric circuits to elevator pits damage during chopping for fuel oil piping. See R.B. Samuels work order #27481 (attached). $1,988.00 - Refeed T.V. monitors in press rom. T.V. could not be installed from underside of slab as shown due to interference with electrified deck. See R.B. Samuels work order #27484 (attached). $1,626.00 ' - Add additional plywood and furring at room #2318 as requested by Bob Melanoff for additional phone work. See Prejcision work order #7056 (attached). $860.00iZ - Remove additional stone to investigate fuel oil pipage work. See Miler Druck work order #50710 (attached). 933.00^ . Subtotal $6,652.00 General Conditions 532.00 Overhead & Fee 431.00 Insurance ___ 95.00 Total

Continued. . . co 317 MADISON AVENUE - NEW YORK, NY 10017 • 212 922 1020 • FAX 212 949 9762

NYC-WTC_000171658

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171658Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #80, 7 WTC, April 1999 · Box 7DCAS

NYC-WTC_000168434

Contractor submits a revised Change Order #80 for $1,631 to remove additional floor granite interfering with fuel oil piping.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.965

machine-extracted · confidence unavailable · Check page ↗
Change Order #62 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168507

Memo from Ambassador Construction submitting Change Order #062 for $9,679 to complete roofing details at a new curb on the 7 World Trade Center roof.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.957

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168622 · Box 7DCAS

Ambassador Construction submits Change Order #023 for steel reinforcement and conduit penetration on the 7th floor.

Similar indexed content

NYC-WTC_000168434 · Box 7DCAS

Contractor submits a revised Change Order #80 for $1,631 to remove additional floor granite interfering with fuel oil piping.

Similar indexed content

Compare copies and versions →