NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's EOM 7WTC
Document / 1 page

Fax cover sheet, Ambassador Construction, Sep 2 1999

Machine-extracted title · confidence 95%

Facsimile transmission cover sheet from Ambassador Construction Co. dated September 2, 1999.

NYC-WTC_000171555

Folder label: “Mayor's EOM 7WTC

Page image
Scanned page image, NYC-WTC_000171555
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

•SEP-02-1999 00=28 P.02 ■ (

Fil AMBASSADOR CONSTRUCTION CO.. INC. goy ) 6 ’999 August 12, 1999 Mr, Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York, NY 10048

Re; . 7 t(Verl4.Trar1<,Cpnter /' r

Dear Mr. Weems; CP- We are pleased to submit herewith our^a^peeal to perform the fo lowing work at the above referenced premises for the sum of ELEVEN THOUSAND SIX Hl JNDREOINDRED SIXTEEN DOLLARS ($11,616.00):

Furnish and install heat tracing on the existing six inch hot water line that runs through the generator room on the 7th Floor. 1\

,A - V' The price includes all electrical wpfk required v '< L , and all insulation repair once the heat tracing is 1 -ty completed. / 1 / If you have any question^'^ease do not hesitate to contact us.

Very truly yours, / / AMBASSAD^ CONSTRUCTION CO., INC.

Martin^chneider Vice President

MS:am Accepted;__________ _ Dated: CAOFnceWPWIN\WOOCSlMARTIN«sriMATE\TFl.CEN WPO

317 MADISON AVENUE • NEW YOPK, NY 10017 - 212 922 1020 ■ FAX 212 949 9762

SEP 02 '99 00:40 TOTPL P.02 PPGE.02 NYC-WTC_000171555

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171555Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #80, 7 WTC, April 1999 · Box 7DCAS

NYC-WTC_000168434

Contractor submits a revised Change Order #80 for $1,631 to remove additional floor granite interfering with fuel oil piping.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.925

machine-extracted · confidence unavailable · Check page ↗
Change Order #26 submission, 7 WTC, Nov 1998 · Box 7DCAS

NYC-WTC_000171821

Letter from Ambassador Construction submitting change order #26 for drywall and electrical patching work at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.920

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168566 · Box 7DCAS

Ambassador Construction submits Change Order #44 to install fuel oil piping and enclosures at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168434 · Box 7DCAS

Contractor submits a revised Change Order #80 for $1,631 to remove additional floor granite interfering with fuel oil piping.

Similar indexed content

NYC-WTC_000171840 · Box 7DCAS

Letter submitting Change Order #38 for $8,346.00 for unspecified scope of work at the Office of Emergency Management.

Similar indexed content

Compare copies and versions →