l^Oposal # 99-669 - Office of Emergency Management October 20,1999
I Page 2
the changes to the existing system amount to adding additional tuners, demodulators, possibk CODECS
(dependent on how the Coast Guard signals are delivered), some peripheral equipment, effectively adding
Jditional television channels W the cun-ent system, as well as some changes to the existing control system
o accommodate the new channels.
Shen Milsom & Wilke, Inc. will provide all design documentation required for an audiovisual contractor to
implement the proposed system, providing drawings and specifications as required as well as construction
reviews, meeting attendance, test and accept the final implementation. Our Design Fee to accommodate
these changes, which considers that DOT is correct with the assumption that there is a cable within a block
or so of 7 WTC, and that DOT will deal with the additional cameras and integration into there system the
Tiroes Square Cameras, is S17,750.
Shen Milsom & Wilke, Inc. is plW5ed to be a part of the OEM Project Team and is looking forward to a
continuing relationship. Should you have any questions please feel free to contact either Peter Stem or
myself at your earliest convenience.
Best regards,
SHEN 5M & WILKE, INC.
* if
J. Steven Emspak
Principal
Shen Milsom & Wilke, Inc.
Tn-rni hia
NYC-WTC_000171351
OCR can misread numbers and units. Confirm readings against the page image before using them.