NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Fire Sprinkler Quotation®7 World Trade Center®1 & Mezz
Document / 1 page

Fire Sprinkler Quotation, 7 World Trade Center, Dec 2000

Machine-extracted title · confidence 98%

Quotation for furnishing and installing Inergen supply cylinders and piping at the Mayor's Office of Emergency Management.

NYC-WTC_000171284

Folder label: “Fire Sprinkler Quotation®7 World Trade Center®1 & Mezz

Page image
Scanned page image, NYC-WTC_000171284
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document a7 2 TO 6693648 P.g8/a@9 _ We 5316-468S-O08S7 p.1 ABCO PEERLESS SPRINKLER CORPORATION 81 SEAVIEW BOULEVARD , PORT WASHINGTON , NEW YORK 11650 PHONE: (516) 294-6850 FAX: (516) 294-6823 NEW YORK CITY MASTER FIRE SUPPRESSION PIPING CONTRACTORS LICENSE #'S 3A & 208A FIRE SPRINKLER QUOTATION QUOTE#: \205E : DATE: 12/S00_ BID TO: Ambassador Const Co ATIN. : Martin Schneider PROJECT : Mayor's Office of EmergencyManagement LOCATION: 7 World Trade Center _PLANS / LATEST DATES : FLOOR (5): 1 & Mezz ___None N/A SCOPE OF WORK: FURNISH & INSTALL CONNECTED RESERVE INERGEN SUPPLY, SCOPE AS FOLLOWS : S___INERGEN CYLINDERS AND CYLINDER RACK TO MATCH EXISITING REPIPE HEADERS IN CYLINDER ROOM AND CONNECT TO EXISTING PIPING _ 2 1-1/2" 3000 LB. RATED CHECK VALVES 1 ADDITIONAL SOLENOID VALVE AND MAIN RESERVE SWITCH THIS PRICE ASSUMES THERE IS SUFPICIENT SPACE IN CLYLINDER FOR NEW CYLINDERS AND HEADERS ALL ELECTRICAL WIRING TO SOLENOIDS AND AMIN-RESERVE SWITCH IS BY OTHERS ALL NEW PIPING, AS SHOWN, IS INCLUDED. ALL WORK WILL BE PERFORMED ON STRAIGHT TIME, IN | PHASE, BY 7-61-01. SHOP DRAWINGS, INSPECTION, AND SIGN-OFF INCLUDED. OUR PR LE 7 ABOVE SCOPE IS : $30,000.00 INCLUSIONS / EXCLUSIONS : SALES TAX Y| ASBESTOS WORK BLDG. DEPT. FIUNG ELECTRICAL WORK O.T. DELIVERY N| CEILING WORK O.T. WORK N| DEMOLITION FIRE WATCH TEMP. FIRE PROTECTION |N THIS QUOTE PREPARED BY : JOHN BOWER Y= PES ;N=-NO 516-298-6850 EXT. 22! EXCL ‘MA WE EXCLUDE RELOCATION OF EXISTING PIPING OR ADJUSTMENT, OF EXISTING HEADS TO REMAIN. PLEASE BE ADVISED THAT THES PROPOSAL IS VALID FOR A PER{OD OF 30 DAYS AFTER DATE OF QUOTATION ~ DEC OS 2000 14:41 S16 465 @597 PAGE.@1 NYC-WTC_000171284

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171284Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Ambassador Construction estimate, May 1998 · Box 7DCAS

NYC-WTC_000172758

Blank or partially filled construction estimate form from Ambassador Construction Company for an unspecified project.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.934

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171300 · Box 7DCAS

Quotation for furnishing and installing concealed type sprinklers in the fuel tank room at 7 World Trade Center.

Similar indexed content

Compare copies and versions →