NYC 9/11 Public Portal Document
THE WESTERLY PROLONGATION OF TSE NORTHERLY LINE OP VESEY STREET, 10.61
FEET;
2. THENCE NORTH 18 DEGREES 10 MINUTES 00 SECONDS WEST, PARALLEL WITH
THE EASTERLY LINE OF WASHINGTON STREET. 188.57 FEET;
3. THENCE SOUTH 88 DEGREES 37 MINUTES 20 SECONDS EAST. ALONG THE
WESTERLY PROLONGATION OF THE SOUTHERLY LINE OF BARCLAY STREET, 10.61
FEET TO THE INTERSECTION OP THE EASTERLY LINE OF WASHINGTON STREET WITH
THE SOUTHERLY LINE OP BARCLAY STREET. ;
4. THENCE SOUTH 18 DEGREES 10 MINUTES 00 SECONDS WEST. ALONG THE
EASTERLY LINE OF WASHINGTON STREET. 188.57 PEET TO THE POINT OR PLACE
OP BEGINNING.
EXCLUDING THAT VOLUME OP THE ABOVE DESCRIBED PARCEL LYING BETWEEN A
LOWER HORIZONTAL PLANE DRAWN AT ELEVATION 5.40 AMD AN UPPER HORIZONTAL
PLANE DRAWN AT ELEVATION 25.40 FOR PUBLIC PEDESTRIAN PASSAGE PROVIDED
THAT SUCH EXCLUDED VOLUME OF SPACE DOES NOT INCLUDE THOSE VOLUMES OP
SPACE THEREIN. NECESSARY FOR COLUMNS. TRUSSES AND FOUNDATIONS TO
SUPPORT THE PROPOSED PEDESTRIAN BRIDGE OVERHEAD.
BENEFIT EASEMENT
WASHINGTON STREET AREA
DAMAGE PARCEL NO. 2
ELF/AT IONS ARE ACTUAL AND REFER TO DATUM USED BY THS TOPOGRAPHICAL
BUREAU. BOROUGH OP MANHATTAN. WHICH IS 2.75 FEET ABOVE NATIONAL
GEODETIC SURVEY VERTICAL DATUM OP 1929 (UNITED STATES COAST AND
GEODETIC SURVEY DATUM) MEAN SEA LEVEL. SANDY HOOK. NEW JERSEY.
SEARINGS ARE IN TSE SYSTEM USED ON THE BOROUGH SURVEY. BOROUGH
PRESIDENT'S OFFICE. MANHATTAN.
BENEFIT EASEMENT AT CORNER OF WASHINGTON AND BARCLAY STREETS
DAMAGE PARCEL NO. 3
BEGINNING AT THE CORNER FORMED BY THE INTERSECTION OP THE EASTERLY LIN
OP WASHINGTON STREET WITH THE SOUTHERLY LINE OP BARCLAY STREET:
1. RUNNING THENCE NORTH 88 DEGREES 37 MINUTES 20 SECONDS WEST. ALONG
THE WESTERLY PROLONGATION OP THE SOUTHERLY LINE OP BARCLAY STREET.
10.61 PEET:
2. THINCE SORTH 43 DEGREES 37 MINUTES 20 SECONDS WEST. 20.98 PEET:
NYC-WTC_000169474
OCR can misread numbers and units. Confirm readings against the page image before using them.