THE WESTERLY PROLONGATION OF THE NORTHERLY LINE OP VESEY STREET, 10.81
FEET;
2. THENCE NORTH L8 DEGREES LO MINUTES 00 SECONDS WEST. PARALLEL WITH
THE EASTERLY LINE OF WASHINGTON STREET. 188.57 FEET;
3. THENCE SOUTH 88 DEGREES 37 MINUTES 20 SECONDS EAST, ALONG THE
WESTERLY PROLONGATION OF THE SOUTHERLY LINE OF BARCLAY STREET, 10.51
FEET TO THE INTERSECTION OF THE EASTERLY LINE OP WASHINGTON STREET WITH
THE SOOTHERLY LINE OP BARCLAY STREET,;
4. TBENCE SOUTH 18 DEGREES 10 MINUTES 00 SECONDS WEST, ALONG THE
EASTERLY LINE OF WASHINGTON STREET, 188.57 PEET TO THE POINT OR PLACE
OF BEGINNING.
EXCLUDING THAT VOLUME OP THE ABOVE DESCRIBED PARCEL LYING BETWEEN A
LOWER HORIZONTAL PLANE DRAWN AT ELEVATION 5.40 AMD AN UPPER HORIZONTAL
PLANE DRAWN AT ELEVATION 25.40 POR PUBLIC PEDESTRIAN PASSAGE PROVIDED
THAT SUCH EXCLUDED VOLUME OF SPACE DOES NOT INCLUDE THOSE VOLUMES OP
SPACE THEREIN, NECESSARY FOR COLUMNS, TRUSSES AMD FOUNDATIONS TO
SUPPORT THE PROPOSED PEDESTRIAN BRIDGE OVERHEAD.
BENEFIT EASEMENT
WASHINGTON STREET AREA
DAMAGE PARCEL NO. 2
ELEVATIONS ARE ACTUAL AND REFER TO DATUM USED BY THS TOPOGRAPHICAL
BUREAU, BOROUGH OF MANHATTAN, WHICH IS 2.75 PEET ABOVE NATIONAL
GEODETIC SURVEY VERTICAL DATUM OF 1929 (UNITED STATES COAST AMD
GEODETIC SURVEY DATUM) MEAN SEA LEVEL, SANDY HOOK, NEW JERSEY.
BEARINGS ARE IN THE SYSTEM USED ON THE BOROUGH SURVEY, BOROUGH
PRESIDENT'S OFFICE, MANHATTAN.
BENEFIT EASEMENT AT CORNER OF WASHINGTON AND BARCLAY STREETS
DAMAGE PARCEL NO. 3
BEGINNING AT THE CORNER FORMED BY THE INTERSECTION OF THE EASTERLY LINI
OF WASHINGTON STREET WITH THE SOUTHERLY LINE OF BARCLAY STREET;
1. RUNNING TBENCE NORTH 88 DEGREES 37 MINUTES 20 SECONDS WEST, ALONG
THE WESTERLY PROLONGATION OF THE SOUTHERLY LINE OP BARCLAY STREET,
10.61 PEET;
2. TBENCE HORTH 43 DEGREES 37 MINUTES 20 SECONDS WEST, 20.98 PEET;
■J
NYC-WTC_000169571