Change Order #3 Memo, 7 World Trade Center, Aug 1998

Machine-extracted title · confidence 95%

Memo submitting Change Order #3 for plug mold outlet installation at the Mayor's Office of Emergency Management.

NYC-WTC_000168694

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #003 Amb. Job #557-5175

Page image
Scanned page image, NYC-WTC_000168694
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

AUG 21 ’98 08 ••16 PR AMBASSADOR CONSTR. C0212 949 9762 TO 7325190 P.02/02

AMBASSACXJR CONSTRUCTION CO. INC

4

August 20, 1998 Mr. Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York. NY 10048

RE. Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23rd Floors Change Order #003 Amb. Job # S57-517S

Dear Mr Weems:

We are pleased to submit herewith our change order #003 to perform the following work at the above referenced premises for the sum of SEVEN THOUSAND THREE HUNDRED SEVENTEEN DOLLARS ($7,317.00).

SCOPE OF WORK 1. Furnish and install plug mold outlet 6" on center in lieu of 12” on center as per Sketch FSK-7 dated 8/14/98. $1,288 00

2. Furnish and install (13) A/V outlets, assumed 1" stub-ups as per Sketch FSK-8 dated 8/17/98. ZW cabling and termination are not included. $1,830 00

3. Sub feeds to surge protector at 23rd Floor and roof as per Sketches FSK-E-l and E-2 dated 8/13/98. $2,460.00

4. Change size of wiring from 3 #10 3/4" to 3 #6 and 1 #8 1" diameter conduit as per Sketch FSK-E-1 dated 8/13/98. $735.00 Subtotal $6,313 00 General Conditions 505.00 Overhead & Fee 409.00 Insurance 90.00 Total $7,317.00

Please send us your formal change order so this work may proceed

Very truly yours,

AMI INS ;tii :o., Martin Sthnetder Vice President

Accepted;^ Dated cc: Glenn Pymento

MS'ag c wpctocstoemfoenwl wjxfl

317 MADISON AVENUE, NEW YORK. NY 10017, 212 922 1020. FAX 212 949 9762

** TOTAL PAGE.02 **

NYC-WTC_000168694

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168694Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #3 submission, 7 WTC, Aug 1998 · Box 7DCAS

NYC-WTC_000172026

Cover sheet and scope of work for Change Order #3 submitted by Ambassador Construction Co. Inc. to [name] Properties at 7 World Trade Center on August 26, 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.975

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173748 · Box 7DCAS

Formal change order submitted by Ambassador Construction to perform work on plug mold outlets and A/V cabling at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000172026 · Box 7DCAS

Cover sheet and scope of work for Change Order #3 submitted by Ambassador Construction Co. Inc. to [name] Properties at 7 World Trade Center on August 26, 1998.

Similar indexed content

NYC-WTC_000168691 · Box 7DCAS

Memo submitting revised Change Order #003 for surge protector sub-feeds at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000173451 · Box 7DCAS

Letter from Ambassador Construction submitting Change Order #003 for electrical work at 7 World Trade Center.

Similar indexed content

Compare copies and versions →