NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/7 World Trade Center Mayor's Office of Emergency Management -1st, 7th, & 23rd Floors Credit Change Order #7
Document / 2 pages

Credit Change Order #7 Memo, 7 World Trade Center, Sept

Machine-extracted title · confidence 50%

Memo submitting revised Credit Change Order #007 for fiber distribution system deletions at the Mayor's Office of Emergency Management.

NYC-WTC_000168674–000168675

Folder label: “7 World Trade Center Mayor's Office of Emergency Management -1st, 7th, & 23rd Floors Credit Change Order #7

Page image
Scanned page image, NYC-WTC_000168674
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Silverstein Properties, Inc « 7 World Trade Center New York, N.Y. 10048 Telephone: 212'619 6569 Fax: 212-732-5190

September 14, 1998

Mr. Glenn Pymento Department of City Wide Administrative Services Division of Real Estate Services 1 Centre Street, DRES - Room 2000 North New York, New York 10007

RE: 7 World Trade Center Mayor's Office of Emergency Management-r‘, 7*, & 23'*^ Floors Credit Change Order #7________ Dear Mr. Pymento:

Attached please find revised credit change order #7 in the amount of ($270,023.00) submitted by Ambassador Construction for the following scope of work:

Audio Visual Work and Equipment Area Press Room

Delete: Fiber distribution system, includes broadcast quality ($141,482.00) Video and balanced line level audio, with intercom. Miscellaneous hardware, switches, relay panels, connectors, cabling, lamps, terminal blocks, wall plates, etc. necessary to insure a complete and operating system. (Force Quote #Q80406MA)

Three (3) audio distribution amplifiers, 1X20, balanced ($ 1,747.00) Configuration (Sigma Electronics ADA-210)

Add; Fiber distribution system, includes broadcast quality $ 25,155.00 Video and balanced line level audio, with intercom. Included non-broadcast quality transceivers for back up. Miscellaneous hardware, switches, relay panels, connectors, cabling, lamps, terminal blocks, wall plates, etc., necessary to insure a complete and operating system. (Forece Quote #Q80728PA)

NYC-WTC_000168674

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168674Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Credit change order #7, September 1998 · Box 7DCAS

NYC-WTC_000173187

Memo regarding a revised credit change order for fiber distribution work at the Mayor's Office of Emergency Management.

5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.999

machine-extracted · confidence unavailable · Check page ↗
Credit change order #7, September 1998 · Box 7DCAS

NYC-WTC_000173189

Letter submitting credit change order #7 reducing costs by $270,023 for fiber distribution system work at the Mayor's Office of Emergency Management.

1 shared non-person entities · Same agency, volume and box · similarity 0.955

machine-extracted · confidence unavailable · Check page ↗
Change order submission memo, Dec 1999 · Box 7DCAS

NYC-WTC_000168355

Letter submitting change order #108 for fiber optic video cable connections and test splices at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.946

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173303 · Box 7DCAS

Submission of Credit Change Order #007 by Ambassador Construction to remove fiber distribution system work at 7 World Trade Center.

Similar indexed content

Compare copies and versions →