NYC 9/11 Public Portal Document
AMBASSADOR CONSTRUCTION CO., INC.
September 10,1998
Mr. Walter Weems
Silverstein Properties Incorporated
7 World Trade Center
New York, NY 10048
RE; Mayor’s Office of Emergency Management
7 World Trade Center
1,7 and 23rd Floors
Change Order #007
Amb. Job #857-5175
Dear Mr. Weems;
We are pleased to submit herewith our credit change order #007 for the following work at the
above referenced premises for the sum of TWO HUNDRED SEVENTY THOUSAND TWENTY
THREE DOLLARS <$270,023.00>:
SCOPE OF WORK
Audio Visual Work and Equipment
AreaPress Room
Delete:
Fiber distribution system, includes broadcast quality
video and balanced line level audio, with intercom.
Miscellaneous hardware, switches, relay panels,
connectors, cabling, lamps, terminal blocks, wall plates,
etc., necessary to insure a complete and operating system. <$141,482.00>
FORCE QUOTE #Q80406MA
Three (3) Audio distribution amplifiers, 1x20, balanced
configuration. <$1,747.00>
SIGMA ELECTRONICS ADA-210
Add;
Fiber distribution system, includes broadcast quality
video and balanced line level audio, with intercom.
Included non-broadcast quality transceivers for back-up.
Miscellaneous hardware, switches, relay panels,
connectors, cabling, lamps, terminal blocks, wall plates,
etc., necessary to insure a complete and operating system. $25,155.00
FORCE QUOTE #Q80728PA
Forward. . .
317 MADISON AVENUE, NEW YORK. NY 10017, 212 922 1020, FAX 212 949 9762
NYC-WTC_000173849
OCR can misread numbers and units. Confirm readings against the page image before using them.