OCT 22 '98 12:56 PP fiMBASSADOR COt^STR. 60212 948 9762 TO 7325190 P.02/^2
M8ASSADOR CONSTRUCTION CO. INC
♦
Mr Walter Weems
Silverstein Properties, Inc
October 22, 1998
7 World Trade Center
New York. NY 10048
RE Mayor’s Office of Emergency Management
7 World Trade Center -1,78 23rd Floors
Change Order #021
Amb. Job # 357-5175
Dear Mr Weems:
We are pleased to submit herewith our change order #021 to perform the following work at the above
referenced premises for the sum of TWENTY THOUSAND THREE HUNDRED FORTY TWO DOLLARS
($20,342 00).
SCOPE OF WORK
As per Cantor Seinuk's sketches S-7.1, S-7-2 and S-23 for work at the water tank and switch gear areas
on the 7th Floor.
1 Add (5) pieces of 10x49 I beam 16' long at water storage area
2. Remove (4) pieces of I beam at the switch gear area
Cost $5,100.00
3 Add concrete pad with reinforcement at the switch gear $2,250.00
4. Furnish and instaii (4) pieces of 10x49 I beam, approximately
16' long at dunnage steel 510,200.00
Subtotal $17,550.00
General Conditions 1,404.00
Overhead & Fee 1,137 00
insurance 251..00
Total $20,342.00
Please approve change order and return to us as soon as possible so we may proceed.
Very truly yours,
to.. INC
Martin Schneider
Vice President
MS;3g
cc: Juan Mejia - SHC
Glenn Pymento - DCAS
Accepted Dated
c \wpclocs\oernioemco2i wodl
317 MADISON AVENUE, NEW YORK, NY 10017, 212 922 1020, FAX 212 949 9762
** IOTHL pHljt.02 + +