NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/BFI proposal to NYC OEM Herman Miller Action Office Series 2
Document / 4 pages

Systems design documentation proposal for OEM furniture, Oct 1997

Machine-extracted title · confidence 95%

Letter from BFI proposing systems design documentation services for the Mayor's Office of Emergency Management furniture installation at 7 World Trade Center.

NYC-WTC_000167286–000167289

Folder label: “BFI proposal to NYC OEM Herman Miller Action Office Series 2

Page image
Scanned page image, NYC-WTC_000167288
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

10/17/97 16:07 NO. 210 004

The duration for each service is based upon a typical floocof between 75 and 100 work stations and does not Include the review proeeas by lWANKB HAVDEN CONNELL ARCHITECTS as outlined above. Actual time may vary depending upon actual floor station counts and length of review process. SOO Basic Services 2'3 Business Days SOO Ouster Layout 1«2 Business Days

Acceleration of tMs time flame is avaHsble through ovartimo performance of required tasks. An up-chaige of 50% will bo assessed to Iha standard fee structure.

RETAINER

A retainer equaling 50% of the entire scope of work to tie performed Is required before work will commence. Pro-forma invoidno par floor will be issued with the retainer being pro-rated. Individual floor manifests will be issued to SWANKS HAYDEN CONNELL ARCHITECTS COO.

MOTE;

BFI will not be responsible for errors In the daaignar^ intent. We win note obvious omissions that are necessary for the completion of the manifestand bring them to the attention of the designer. BFI will conflrmmoRufaetamr'skitaadeterse of product Our preparation of the manifest wM reiatadirecthf to thefbmittire as coded on the submitted plans. BFI is not responalble for the accuracy of archiiocturai dbnansioos in the space or shown on the floor plans provided to us to prepare Em manifesta. Any dafldencins in the width of aisles or due to field conditions is the responsibility of SWANKE HAYDEN CONNELL ARCHITECTS.

additional;

The making of major revisions in drawings, speeNleatione or other documents whan such is inconsistent with approvals or instructJona previousiy given and are due to causes beyond the control of BFI, can ba provided at an additionai fee. For additional services, a fee of 350.00 per affsoM work stadonwlll ba assessed. Client approval required prior to commencement.

NYC-WTC_000167288

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167288Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

1 shared non-person entities · Same agency, volume and box · similarity 0.915

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171829 · Box 7DCAS

Proposal for change order #2 to install cabinets, countertops, and paneling at the Office of Emergency Management.

Similar indexed content

Compare copies and versions →