10/21/97 TUE 12:27 FAX 212 736 3519 COSENTINI ASSOC. I2I006
Mr. Joseph Aliotta
Swanke Hayden Connell, Ltd.
October 17, 1997
Revised October 21, 1997
Page - 5 -
Countini AuociciM LLP
Conwllmg Engineen
£cs
Our fee proposal is based the following:
A. Basic MEP Services includes:
MEP General Office: $ 7,650 based on 9,000 s.f.
MEP Emergency
Management Center: $35,000 based on 14,000 s.f.
Jia LTsihDDto-Spaccs; based on 12,000 s.f.
TOTAL $72,650
Emergency Gen. Scope: $30,000 (not to exceed with 3.0
multiplier x direct labor salary)
Controlled Inspection: $12,000
Balancing Review: $ 6,000
Reimbursables: $ 7,265 (not to exceed plus $3,000 not to
exceed for Emergency Gen.
Scope)
NOTE: Fees assume “as-builts” of MEP systems exist.
Billing is as follows:
Schematic Design 35%
Construction Document - 40%
Bidding & Negotiation - 5%
Construction Admin. 20%
New York Wnihipc ■ L/'