DCAS approval of structural engineering services, Feb 1998

Machine-extracted title · confidence 90%

Department of Citywide Administrative Services approves a sub-consultant to perform structural engineering services for mechanical spaces and fuel tanks at 7 WTC.

NYC-WTC_000167231–000167233

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 7th & 23rd Floors New York, New York Project # 96-1346

Page image
Scanned page image, NYC-WTC_000167231
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DEPARTMENT OF CITYWIDE ADMINISTRATIVE SERVICE DIVISION OF REAL ESTATE SERVICE Hne MUNICIPAL BUILDING Room 2053S NEW YORK, N.Y. 10007 (212)669-3645 Fax (212)669-2666

WILLIAM J. DIAMOND LORI FIERSTEIN Qxnnussioner Deputy Cbmmjsstoner

Jantiary 27,1998

Catherine T. Gilberti Silverstein Properties 521 Fifth Avenue New York, New York 10175

Re: Mayor’s Office of Emergency Management 7 World Trade Center 7* & 23"* Floors New York, New York Project #96-1346

Dear Ms. Gilberti:

We are in receipt of the proposal for structural engineering services submitted by The Cantor Seinuk Group P.C., dated December 17, 1997, regarding the captioned project.

We hereby approve The Cantor Seinuk Group as the selected sub-consultant for Swanke Hayden Connell Architects to perform all the necessary structural engineering services associated with the mechanical spaces at the 7* floor, the emergency fuel oil tank at the Ground Floor, miscellaneous slab penetrations, reinforcement of the 23"* Floor structure if required, and the Radio Room at Roof Level. Bidding and construction documents shall be prepared, as well as construction administration.

The City’s opinion in reference to the Landlord’s proposed allocation of the fuel oil tank on the ground floor is that it is a very costly solution. The City feels strongly that it should be allowed to use the building emergency fuel oil, and pay for its consumption. In that case, the City will be entitled to a credit on the engineering fees for the portion of the work.

NYC-WTC_000167231

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167231Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Consultant team approval, OEM 23rd floor, Feb 1998 · Box 7DCAS

NYC-WTC_000170841

DCAS approves a consultant team to perform architectural and engineering services for the Mayor's Office of Emergency Management on the 23rd floor.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →